architecture-decision-planner
Identifies architecture decisions that must be made before implementation and prepares viable alternatives, trade-offs, decision criteria, evidence needs, owners, and deadlines. Use when a project, fe
SKILL.mdskills/project-planning/architecture-decision-planner/SKILL.md
GitHubArchitecture Decision Planner
Purpose
Expose the architecture choices that materially affect implementation, distinguish blocking decisions from choices that can be deferred, and prepare a decision-ready comparison without silently choosing on behalf of the responsible people.
When to use this skill
Use this skill when:
- A project or feature is approaching implementation with unresolved technical choices.
- The team needs to compare architecture alternatives using explicit criteria and evidence.
- A migration, integration, platform change, or shared contract may constrain downstream work.
- The user wants a decision agenda, architecture decision backlog, or ADR-ready analysis.
- Estimates or implementation plans depend on choices about boundaries, data, interfaces, dependencies, deployment, security, reliability, or ownership.
Do not use this skill when:
- The architecture decision has already been made and only needs to be documented; use an ADR-writing workflow instead.
- The user wants an implementation task sequence after all material decisions are settled; use
implementation-plan-writer. - The main problem is incomplete product requirements rather than technical alternatives; use
requirements-gap-finder. - The request is to implement, benchmark, or migrate a system rather than plan the decisions first.
Inputs to inspect
Start with the smallest relevant set of available inputs:
- Project brief, feature request, PRD, acceptance criteria, and explicit non-goals
- Existing architecture diagrams, ADRs, technical proposals, and system boundaries
- Repository structure, dependency manifests, configuration, schemas, API contracts, and deployment definitions
- Current operational constraints, service-level objectives, observability, security, privacy, accessibility, and compliance requirements
- Migration, compatibility, data retention, rollback, and interoperability requirements
- Team ownership, skills, maintenance capacity, delivery deadline, and cost constraints
- Known alternatives, prototypes, benchmarks, incidents, or stakeholder decisions
Do not infer that an absent requirement is unimportant. Record consequential missing information as an assumption, evidence gap, or prerequisite decision.
Workflow
Define the decision boundary.
- State the system, feature, migration, or integration in scope.
- Identify the intended outcome, planning horizon, fixed constraints, and explicit non-goals.
- Separate confirmed facts from assumptions and proposals.
Trace implementation-sensitive surfaces.
- Inspect component and service boundaries, data ownership, APIs and events, state and persistence, third-party dependencies, deployment topology, security boundaries, reliability, observability, migration, rollback, and maintenance ownership.
- Ask which choices would change interfaces, estimates, task order, testing strategy, operating cost, reversibility, or the work of multiple teams.
Build the decision inventory.
- Phrase each item as one bounded choice, not a broad topic such as “choose the architecture.”
- State the implementation work or contract the decision unlocks.
- Merge duplicates and separate coupled decisions that require different owners or evidence.
Classify timing and impact.
- Mark each decision as
blocking,time-bound, ordeferrable. - Rate impact as
high,medium, orlowbased on blast radius, cost of reversal, uncertainty, and number of downstream consumers. - Explain the trigger or last responsible moment for every non-blocking decision.
- Mark each decision as
Define decision criteria before comparing alternatives.
- Derive criteria from goals and constraints rather than personal preference.
- Consider functional fit, compatibility, accessibility, security, privacy, performance, reliability, scalability, delivery effort, operating cost, testability, observability, maintainability, team familiarity, vendor dependence, migration risk, and reversibility where relevant.
- Mark hard constraints as pass/fail gates. Weight softer criteria only when the weighting can be justified.
Prepare viable alternatives.
- Include the current-state or “defer change” option when it is genuinely viable.
- Describe each option at comparable granularity.
- Eliminate an option only with evidence that it violates a hard constraint; otherwise preserve uncertainty.
- Avoid false balance: do not pad the comparison with obviously unsuitable choices.
Compare trade-offs and consequences.
- Evaluate every viable alternative against the same criteria.
- Record benefits, costs, risks, operational consequences, migration implications, lock-in, reversibility, and assumptions.
- Distinguish facts from estimates and inferences. Do not invent benchmark numbers, costs, or organizational preferences.
Identify evidence needed to decide.
- For material uncertainty, specify the smallest useful action: stakeholder answer, documentation check, prototype, benchmark, threat model, compatibility test, cost estimate, or operational review.
- State what result would favor or eliminate an alternative.
- Avoid open-ended research that has no decision threshold.
Assign decision mechanics.
- Name the accountable decision owner when supported by the inputs; otherwise mark ownership unresolved.
- Identify required contributors and affected consumers.
- Set a decision deadline or triggering milestone based on downstream dependency and reversal cost, not an arbitrary date.
Order the decision agenda.
- Put blocking, high-impact, and prerequisite decisions first.
- Show dependencies between decisions and expose circular dependencies.
- Recommend parallel evidence-gathering only when it does not assume an unresolved upstream choice.
Make a recommendation only when justified.
- If evidence and authority are sufficient, name the leading alternative and explain why it best satisfies the criteria.
- If they are insufficient, return a conditional recommendation or a decision-ready shortlist instead of pretending certainty.
- Keep the decision itself open when the responsible owner has not authorized the agent to make it.
Check implementation readiness.
- State which work can safely begin now, which work must wait, and which assumptions must be tracked if work proceeds conditionally.
- Identify decisions suitable for an ADR after approval.
Output format
Return the result using this structure:
## Decision readiness summary
- Readiness: blocked | conditional | ready
- Scope: ...
- Decisions: X blocking, Y time-bound, Z deferrable
- Work safe to begin: ...
- Work that must wait: ...
## Known context and assumptions
- Confirmed: ...
- Assumed: ...
- Missing: ...
## Decision agenda
| ID | Decision | Timing | Impact | Unlocks | Owner | Deadline or trigger | Depends on |
|---|---|---|---|---|---|---|---|
| AD-01 | ... | blocking | high | ... | ... | ... | ... |
## Decision briefs
### AD-01 — Decision title
**Question:** One bounded decision question.
**Context and constraints:** ...
**Criteria:**
| Criterion | Gate or weight | Why it matters |
|---|---|---|
| ... | ... | ... |
**Alternatives:**
| Alternative | Benefits | Costs and risks | Reversibility | Evidence confidence |
|---|---|---|---|---|
| ... | ... | ... | ... | ... |
**Evidence needed:** ...
**Recommendation:** preferred | conditional | undecided — rationale.
**Consequences:** ...
## Decision dependencies and sequence
1. ...
## Implementation guardrails
- May begin now: ...
- Must wait: ...
- Track as explicit assumptions: ...
- Convert to ADR after approval: ...
Keep the comparison proportional. For a small, reversible choice, a compact decision brief is enough; reserve full matrices for consequential or contested decisions.
Quality bar
The task is complete only when:
- Every listed decision is a bounded question that unlocks identifiable implementation work or a shared contract.
- Blocking decisions are separated from time-bound and safely deferrable choices.
- Alternatives are viable, compared at the same level, and assessed against criteria derived from actual goals and constraints.
- Facts, assumptions, estimates, recommendations, and unresolved questions are clearly distinguished.
- High-impact uncertainty has a focused evidence action and a result threshold tied to the decision.
- Decision dependencies, owners, affected consumers, and last responsible moments are explicit when knowable.
- Recommendations explain trade-offs and consequences rather than presenting a context-free winner.
- The output states what implementation may begin and what must wait.
- No architecture choice is treated as approved without evidence of the appropriate authority.
Edge cases
- If context is sparse, produce a provisional decision inventory and targeted discovery questions; do not fabricate alternatives or constraints.
- If only one viable alternative remains, show which hard constraints eliminated the others and still assess the remaining option's risks.
- If a choice is cheap and reversible, defer it unless it blocks a contract or would create avoidable rework.
- If decisions are tightly coupled, identify a governing decision or propose a small experiment that resolves the coupling.
- If stakeholders optimize for conflicting outcomes, expose the conflict and required owner instead of hiding it in a weighted score.
- If a legacy system must remain operational, treat coexistence, migration, data integrity, rollback, and observability as first-class decision criteria.
- If external products or current platform capabilities determine feasibility, mark the required source verification; do not rely on stale recollection.
- If the user requests implementation during this workflow, finish the decision boundary first and obtain the missing decision authority before making consequential changes.