Conducting a Gate

Overview

A gate is a named checkpoint where the run halts until a recorded human decision exists in gates/. It is the framework's only hard stop. Everything else — handoffs, findings, loop-backs — moves work between agents; a gate is where a person takes responsibility.

Two consequences follow, and both are routinely got wrong:

  1. A run waiting at a gate is not stuck. It is the framework working. Do not "unblock" it by proceeding.
  2. The record is the decision. A verbal approval, a chat message, or an agent's belief that the approver would agree is not a gate. If gates/gate-N-*.md does not exist and name a person, the gate has not happened.

The Orchestrator assembles evidence and halts. A human decides. No agent may sign a gate, and no agent may proceed past one on its own authority.

When to Use

  • A run has reached a gate and the evidence needs assembling and presenting.
  • You are the approver and need to know what you are actually signing.
  • A gate came back rejected or approved-with-conditions and the run must resume correctly.
  • A mid-run scope change has arrived and you need to know which gate it re-opens.

Do NOT use for: informal checkpoints that gate nothing downstream by a signature — the defect case's reproduction sign-off, for example. Those are confirmations, not gates, and they produce no record.


Step 1 — Identify which gate, and which variant

The three standard gates are the greenfield set (agent-handoff-protocol.md §3.1):

Gate Fires after Approves
1 — Scope Requirements Analyst Requirements doc, glossary, every open question answered
2 — Design Architecture Guardian's clean review Architecture, stack, integration inventory, cost-relevant choices
3 — Release Release evidence assembled The production release itself

A case may use fewer gates, or a variant (§3.4). Check your playbook's gates: frontmatter first — the variant changes the trigger, the ordering, or the decision vocabulary, never the requirement for a recorded human decision:

  • Release — emergency/retroactive (incident, active-exploit dependency-upgrade) — mitigation deploys first under documented emergency authority; the gate is signed retroactively against the logged action timeline. Add emergency_authorized_by and attach the timeline as evidence. No rigor is waived — regression, review, and the post-incident report still happen, only after restore.
  • Behavior-parity (refactor) — one gate, two checkpoints: the characterization suite was captured all-green before any code moved, and is green and identical test-for-test after. approved requires both halves.
  • Data-operation (pre-execution) (data-operation) — fires before execution. The approver signs the operation plan and the rollback plan together, with the dry-run diff attached. Post-execution verification is a closure condition, not a second gate.
  • Findings / decision (spike) — accepts a decision/findings record. decision: accepted, no deployment, and no canonical promotion.
  • Release — baseline-approval (brownfield-onboard) — approves a reconstructed baseline rather than a deployment; on approval the baseline is promoted to canonical docs/.

Step 2 — Assemble the evidence

The approver should not have to go looking. Assemble, from the run workspace:

  • The artifacts under review, by path — not summaries of them.
  • The clean review that qualifies the gate, where one applies (Gate 2 needs the Architecture Guardian's review to be clean, not merely to exist).
  • Every open risk, with ID and severity. Risks are never deleted; they are resolved or formally accepted, and acceptance requires the approver's name.
  • Every open question. For Gate 1 this is the substance of the gate — an unanswered question is an unapproved requirement.
  • Verification output where the gate rests on it: test results, dry-run diffs, characterization suites, release evidence.
  • Cost- and legal-relevant choices, surfaced explicitly. Gate 2 is where hosting, provider, and retention decisions become expensive to reverse.

A gate presented as "everything looks good" is not assembled. Name the paths.

Step 3 — Write the gate record

runs/<run-id>/gates/gate-<n>-<slug>.md, in the §3.2 format:

# Gate 2 — Design
run: 2026-06-comedor-mvp
decision: approved            # approved | approved-with-conditions | rejected
approver: <name from packet §16>
evidence_reviewed:
  - runs/.../02-design/architecture.md
  - runs/.../findings/architecture/review-002.md   (clean)
conditions: []                # binding; the Orchestrator tracks each as a risk
notes: ...
  • approver is a person named in packet §16. Not a role, not an agent, not "the team".
  • evidence_reviewed lists paths, each annotated where its state matters ((clean)).
  • conditions are binding. Each one becomes a tracked risk that must be closed before Gate 3. An aspiration written into notes is not a condition and will not be tracked.
  • The spike variant uses decision: accepted.

Step 4 — Resume correctly

Decision What happens next
approved The run proceeds to the next playbook step.
approved-with-conditions The run proceeds; each condition becomes a tracked risk, registered in state.md with an ID, and must be terminal before Gate 3.
rejected The run routes back to the producing agent, with the rejection notes issued as a new inbound handoff — not as chat. Re-review after the fix; the original gate record stands as history and a new one records the second decision.

A rejected gate is not an edit to the existing record. Records, like handoffs, accumulate.

Step 5 — Handle a mid-run scope change

A scope change re-opens Gate 1 (§3.3). The flow is fixed:

packet amendment → Requirements Analyst delta review → Gate 1 re-approval
                 → Bundle Compiler delta → Bundle Intake Validator

Three rules that get broken under time pressure:

  • Never edit the frozen packet under 00-packet/. A scope change is an amendment file beside it.
  • Implementers never absorb scope changes directly from chat. A change that reaches an implementer without passing Gate 1 is untraceable by construction.
  • A request too large for an amendment queues as the next increment run (§6.6). "Too large" is a judgement the approver makes, not the implementer.

What a gate is not

  • Not a status meeting. It approves specific artifacts against specific criteria.
  • Not an agent's decision. The Orchestrator halts and presents; it never signs, and it never overrides a reviewer's blocking finding without explicit human approval.
  • Not retroactive — except the one variant that says so, in writing, with an authorizing name and a timeline.
  • Not skippable when the run is "obviously fine". The obvious-fine runs are the ones where skipping becomes habit.

Checklist

  • Correct gate and correct variant for this case's gates: frontmatter
  • Every artifact under review named by path
  • Qualifying review is present and clean, where the gate requires one
  • Every open question answered (Gate 1) or explicitly deferred with a named owner
  • Every risk ID listed with severity; accepted risks carry the approver's name
  • Verification output attached where the gate rests on it
  • Cost- and legal-relevant choices surfaced, not buried
  • Record written to gates/gate-<n>-<slug>.md in the §3.2 format
  • approver is a person named in packet §16
  • Conditions registered as tracked risks in state.md
  • Rejection routed back as a new inbound handoff, not as chat

Reference

  • process/agent-handoff-protocol.md — §3.1 standard gates, §3.2 record format, §3.3 semantics and scope change, §3.4 case variants, §6 closure
  • process/playbooks/<case>.md — which gates this case uses and where
  • templates/stakeholder-input-packet.md — §16 names the approver
  • resuming-a-run skill — reconstructing where a halted run stands