bmc-experiment-method-selection

Decides HOW to test a BMC hypothesis based on real build effort — build and test immediately if a working version is achievable in about two weeks, otherwise choose a cheaper proxy method (landing pag

SKILL.md

GitHub

BMC Experiment Method Selection

Purpose

Once a hypothesis exists, the next decision is often made badly by default: teams either start building whatever they imagined, regardless of how long it will take, or they endlessly discuss the idea without testing it at all. This skill makes the build-vs-proxy decision explicit and fast, using build effort as the deciding factor — and gives a menu of proxy methods matched to what's actually being tested, for the cases where building isn't the right first move. Use immediately after a hypothesis is stated (see bmc-tool-switching-decisions's hypothesis quality criteria), before any work on building anything begins.

Anchored in research

Grounded in the Lean Startup testing tradition, specifically Ash Maurya's Running Lean and Scaling Lean (short, fixed-length "LEAN sprint" testing cycles as a discipline against endless, unstructured building) and the broader Lean Startup practice of matching experiment fidelity to what's being learned (Eric Ries). The roughly-two-week threshold below is a practical rule of thumb consistent with this tradition's emphasis on short, bounded test cycles — treat the number itself as a useful default, not a fixed law; the underlying discipline (a short, DEFINED cycle, chosen deliberately rather than defaulted into) matters more than the exact figure.

Method

  1. State the hypothesis in testable form first. Reuse bmc-tool-switching-decisions's three hypothesis-quality criteria: testable (would the result actually change the team's belief?), precise (does it include a number, timeframe, or threshold?), isolated (does it test exactly one variable?). Don't run this skill against a vague idea — sharpen the hypothesis first.
  2. Effort-estimate honestly. Could a working version that would genuinely change the team's belief be built in roughly two weeks, with the team's real current skills and resources — not an idealized, best-case estimate? Be specifically suspicious of optimistic estimates for anything involving hardware, regulated products, complex third-party integrations, or long procurement/legal cycles.
  3. If yes — build it now, and stop planning. Build the narrow, hypothesis-proving version and get it in front of real customers immediately. Don't let the plan expand past what's needed to test this one hypothesis (see the "narrow, hypothesis-proving proto" framing already used in this repo's prototyping-and-demonstration pack). Hand off to prototyping-and-demonstration/rapid-prototype-and-vibe-coding-craft for the actual build.
  4. If no — do not start building. Choose a proxy method instead, matched to what's actually being tested:
    • Testing interest/demand → a landing page with a real call to action (sign up, join a waitlist, request access) and real traffic (even a small ad spend) — measure actual click-through and sign-up rate, not survey answers.
    • Testing usability or the value proposition's clarity → a clickable mockup or prototype (Figma or similar) walked through live with 8-10 real prospects, watching where they hesitate or misunderstand.
    • Testing willingness to pay → a pre-order or a refundable deposit at the target price — nothing substitutes for an actual ask for money (see bmc-economic-prototyping's WTP test menu for more detail on this specific case).
    • Testing delivery feasibility, without building the automation yet → a Wizard-of-Oz test: deliver the "automated" experience manually behind the scenes, so customers experience the intended outcome while the team learns what the real delivery challenges are before investing in building it.
    • Testing whether a printed/PDF pitch resonates in a real sales conversation → a brochure or one-pager used live, in an actual sales or discovery conversation, watching for genuine objections versus polite interest.
  5. Match the method to the hypothesis, not to what's easiest to make. A landing page tests interest, not usability. A clickable mockup tests usability, not willingness to pay. Using the wrong method produces a confident-looking result that doesn't actually answer the question the team needed answered — check this match explicitly before running the test.
  6. Time-box every test, regardless of method. Set an explicit "we'll have an answer by [date] either way" before starting — the point of the two-week logic isn't the literal number, it's forcing a short, defined cycle instead of an open-ended one. A proxy test that's allowed to run indefinitely defeats the purpose as much as an over-planned build would.

What this skill does NOT do

  • Doesn't do the actual building — once "build it now" is the decision, hand off to prototyping-and-demonstration/rapid-prototype-and-vibe-coding-craft.
  • Doesn't replace bmc-tool-switching-decisions's hypothesis-quality check — this skill assumes a sharpened hypothesis already exists and starts from there.
  • Doesn't guarantee any given proxy method will produce a clean signal — proxy tests are directional and cheap by design, which trades away some rigor for speed; treat results accordingly, especially before a large, hard-to-reverse commitment.

Refinement notes

  • Which proxy method (landing page, clickable mockup, Wizard of Oz, pre-order, brochure) has produced the most reliable signal in your own practice, and which has most often misled a client?
  • Is roughly two weeks the right default threshold in your experience, or does it vary meaningfully by industry/client type?
  • What's the most common mismatch you've seen between the method chosen and what actually needed testing (Step 5)?

Continue from here

  • Uses: bmc-tool-switching-decisions/SKILL.md's hypothesis-quality criteria as the starting point.
  • Uses: bmc-economic-prototyping/SKILL.md's WTP test menu for the willingness-to-pay case specifically.
  • Feeds into: ../../../../prototyping-and-demonstration/skills/rapid-prototype-and-vibe-coding-craft/SKILL.md once "build it now" is the decision.
  • This pack's shared guardrails: ../../CLAUDE.md

References

  • ../../references/bmc-source-material-notes.md — source material background
  • ../../references/bmc-resilience-heuristics-research.md — selection and grounding notes for this skill and its siblings
  • ../../CLAUDE.md — this pack's shared guardrails