grace-spec

Interview the user and create an approved GRACE 4 GraceChangeSpec plus optional design-context.xml inside .grace/changes/active/C-*/.

SKILL.md

GitHub
<skill> <change_bundle_contract> `.grace/changes/active/C-CHANGE-ID/`
  • spec.xml — normative GraceChangeSpec
  • design-context.xml — optional, explanatory only
  • plan.xml — created later by grace-plan</change_bundle_contract>
<status_rules> Create `spec.xml` as `status="draft"`. Set `status="approved"` only after explicit user approval. Rejected or cancelled specs move to archive with terminal status. Do not create or edit `plan.xml` in this skill. </status_rules> <strict_contract> The direct `C-*` wrapper must contain exactly one meaningful `Summary`, `Goals`, `Constraints`, `NonGoals`, `AcceptanceCriteria`, `AffectedAreas`, and `VerificationIntent` section. Empty containers are not approval-ready. Semantic anchors are canonical attribute-free XML tags, never attributes or attribute values. </strict_contract> <workflow> 1. Ask one focused question at a time until goal, scope, constraints, non-goals, acceptance criteria, affected areas, and verification expectations are clear. 2. Propose a concise design summary and explicit assumptions. Ask for approval before writing an approved spec. 3. Create a deterministic uppercase-kebab `C-*` change id. 4. Write `spec.xml` from `references/change-spec-template.xml` with exactly one direct `C-*` wrapper and no empty required section. 5. If rationale, alternatives, scenarios, or external constraints would otherwise bloat the spec, write non-normative `design-context.xml` from its template. 6. If approval is not explicit, leave `spec.xml` as `status="draft"` and report the approval step needed. </workflow> <hard_rules> - `spec.xml` is the source of truth for `grace-plan`; design context never adds requirements. - Do not implement code, mutate current graph/verification state, or create retroactive change bundles. - Recommend `grace lint --path <project-root> --assertions current` as a pre-implementation active-baseline check after writing the bundle; never present it as target or final evidence. </hard_rules> </skill>