GitHubPlanning Skill
AOS correlation: new PRDs, implementation plans, and progress trackers for AOS-managed work
should preserve aos_feature_uuid once assigned and keep native slugs as aliases. Contract:
docs/agentic-operator/contracts/aos-correlation.md.
About This Skill
The Planning Skill generates and optimizes Product Requirements Documents (PRDs) and Implementation Plans as AI artifacts - file-based context caches optimized for AI agent consumption rather than human reading.
Plan doctrine (Claude-5 generation, new Tier 2/3 plans). Milestones not phases, no plan-time model/agent pins, thin plan mass, context-class sizing —
references/plan-doctrine.mdis the single authoring rule set; this file wires it into the workflow steps below and does not restate it. In-flight plans finish under the rules they were authored on.
Purpose
- Generate comprehensive PRDs from feature requests following MP template
- Create phased Implementation Plans with subagent task assignments
- Optimize existing planning docs by breaking into token-efficient files
- Set up progress tracking structures for multi-phase implementations
Key Benefits
- Token Efficiency: ~800 lines/file is the hard ceiling for any planning doc; Tier 2/3
Implementation Plans target a tighter <=150-line mass budget (
references/plan-doctrine.md) - Progressive Disclosure: Summary → Detail pattern with linked files
- Subagent Integration: Automatic task assignment to appropriate specialists
- MP Architecture Compliance: Plans follow layered architecture (routers → services → repositories → DB)
- Structured Tracking: One progress file per phase following CLAUDE.md policy
Token Discipline (Mandatory for Orchestrators)
Opus must NOT read source documents that subagents will also read. Provide file paths in delegation prompts instead.
| What to Delegate | Agent | Prompt Size Target |
|---|---|---|
| OQ assessment | haiku (general) | 10-15 lines |
| PRD creation | prd-writer (sonnet) | 30-50 lines |
| Implementation plan | implementation-planner (sonnet) | 40-60 lines |
| Progress files | python-backend-engineer (sonnet) | 20-30 lines |
What Opus reads directly: Tracker entries (5 lines), meta-plan rows (5 lines), frontmatter for edits (~15 lines). Nothing else.
Anti-patterns with measured cost: See docs/project_plans/CLAUDE.md for the full anti-pattern table with token costs. Key rule: reading a SPIKE as Opus to inform a prd-writer prompt costs ~7K tokens; delegating OQ assessment to haiku costs ~1.2K (6x cheaper).
Agent Consumption Rule
Agents invoked for implementation, review, or execution MUST NOT load docs/project_plans/human-briefs/ files unless the task prompt explicitly names the brief.
- The
audience: [humans]frontmatter field is the machine-readable skip signal. - Briefs contain orchestrator-level rationale (estimation narrative, wave strategy, open-question inventory). This content is irrelevant to executing subagents and burns context budget without improving output quality.
- Exception: An agent may be explicitly asked to populate an initial brief skeleton or append a note to the Running Log. In both cases, the task prompt must name the brief file explicitly.
- Spec reference:
.claude/specs/artifact-structures/human-brief-spec.md§5.
When to Use This Skill
- Creating PRDs for new features or enhancements
- Generating milestone-based implementation plans from PRDs
- Breaking down long planning documents (>800 lines) into manageable files
- Setting up progress tracking for multi-phase work
- Optimizing existing plans for better AI agent consumption
- Generating Planning Review Boards to visualize all planning artifacts for a feature
When NOT To Use This Skill
- A Feature Contract or plan already exists for the work — extend or re-scope the existing artifact instead of authoring a parallel one (see Cross-Reference Policy below).
- Tier 0 trivial work (1–3 pts, single file) — route straight to
/dev:quick-feature; no planning artifact is warranted. - The request is an idea to capture, not work to plan yet — route it through
op capture/op newinstead of drafting a PRD or plan prematurely.
Before You Scope — Check MeatyWiki, SkillMeat, and the Deferred Backlog (and IntentTree)
Before authoring a PRD or implementation plan, run these look-first checks, in this order —
concrete commands, not a "remember to check" reminder (per the look-first/save-after doctrine in
.claude/rules/aos-operating-rules.md):
1. MeatyWiki — has this already been researched or decided?
meatywiki search "<feature-topic-or-keywords>" --mode hybrid
Scan the top hits for prior architecture decisions, design specs, or research findings on the same
surface. Pull a relevant hit into the PRD's related_documents instead of re-deriving the finding.
Use meatywiki query "<question>" --file-back for a direct Q&A pass when a search alone doesn't
resolve the question.
2. SkillMeat — does a reusable artifact already cover this?
skillmeat search "<feature-keywords>" --type skill --json | jq '.results[] | {name, type, description}'
skillmeat list --project <this-repo-slug> --json | jq '.results[] | select(.name | test("<keyword>"; "i"))'
If an existing skill/agent/workflow/context artifact already covers the capability being planned,
scope the PRD as an extension of that artifact (name it explicitly) rather than a net-new build.
This same look-first check gets formalized later as the plan's required_artifacts set — see
Required Artifacts Resolution in Workflow 2, step 5.5.
3. Deferred backlog — is this already tracked?
Scan the deferred items backlog (.claude/rules/deferred-backlog.md →
docs/project_plans/deferred-items-backlog.md) for items on the same surface or higher-priority
adjacent items. Pull related DI- rows into the plan when they fit — landing neighboring deferrals
together is the cheapest time to clear them, and the backlog's "Next Polish Pass" section names the
current recommended track. Reference pulled items by DI- ID in the plan, and flip their Status to
in-progress when the plan commits.
Also check IntentTree first (default-on, best-effort — per the one-gate contract in
.claude/rules/intenttree-integration.md: unset/1/true/auto all mean enabled, only an
explicit falsy value disables it, and it is a no-op when no binding exists). Query the bound tree
for related/in-flight nodes so the plan reuses or links existing work instead of duplicating it,
per the LOOKUP recipe in that rule file
(itt --json tree graph <id> then filter backlog/in_progress over .nodes[] in jq — node list
requires an off-tree/workspace scope, so the tree-scoped graph is the in-tree lookup). The markdown backlog stays the
canonical "check first" source; the node query is the queryable complement.
Quick Start
Create PRD from Feature Request
# User provides feature description
User: "Create a PRD for advanced filtering on the prompts page"
# Skill generates PRD at:
# docs/project_plans/PRDs/advanced-filtering-v1.md
Create Implementation Plan from PRD
# Provide PRD path
User: "Create implementation plan for docs/project_plans/PRDs/harden-polish/advanced-filtering-v1.md"
# Skill generates:
# - Main plan: docs/project_plans/implementation_plans/harden-polish/advanced-filtering-v1.md
# - Phase files (if needed): docs/project_plans/implementation_plans/harden-polish/advanced-filtering-v1/phase-[N]-[name].md
Generate Planning Review Board
# Auto-discover all planning docs for a feature and generate interactive HTML board
python scripts/generate-planning-board.py \
--feature-slug enterprise-tier-comparison-scopes \
--wireframe-dir docs/dev/designs/wireframes/enterprise-unified-sync \
--output planning-review-board.html \
--open
# Or from a specific implementation plan path
python scripts/generate-planning-board.py \
--plan docs/project_plans/implementation_plans/some-feature-v1.md
# Preview what would be discovered without generating
python scripts/generate-planning-board.py --feature-slug xyz --dry-run
Reference: .claude/skills/planning/references/planning-review-board.md
Optimize Existing Plan
# Provide existing plan path
User: "Optimize docs/project_plans/implementation_plans/harden-polish/sidebar-polish-v1.md"
# Skill:
# 1. Analyzes plan length (e.g., 1200 lines)
# 2. Breaks into phase-specific files (~400 lines each)
# 3. Updates parent plan with links to phase files
Create Progress Tracking
# Provide PRD or Implementation Plan
User: "Create progress tracking for data-layer-fixes PRD"
# Skill generates:
# .claude/progress/[feature-name]/all-phases-progress.md
# With task breakdown, subagent assignments, completion tracking
Track Plan Status Lifecycle
# Mark PRD approved
python .claude/skills/artifact-tracking/scripts/manage-plan-status.py \
--file docs/project_plans/PRDs/feature-name-v1.md \
--status approved
# Mark implementation in progress
python .claude/skills/artifact-tracking/scripts/manage-plan-status.py \
--file docs/project_plans/implementation_plans/feature-name-v1.md \
--status in-progress
# Mark implementation completed
python .claude/skills/artifact-tracking/scripts/manage-plan-status.py \
--file docs/project_plans/implementation_plans/feature-name-v1.md \
--status completed
Status values: draft → approved → in-progress → completed
Reference: See .claude/skills/artifact-tracking/plan-status-management.md for full status management guide.
Model policy:
docs/agentic-operator/MODEL-ROUTING.md(§1.5 scorecard) is canonical. Model/effort tables in this file are derived convenience copies — when they disagree, MODEL-ROUTING wins; update it first, then re-derive here. Resolve provider/model per leg via thedelegation-routerskill; the platform skills (ica-delegate,codex,gemini-cli) only execute the decision.
Tier Matrix (Routing Decision Tree)
Before authoring any planning artifact, determine the feature's tier. Tier drives artifact type, execution model, reviewer requirement, and model routing. Use the table below.
| Tier | Size | Pre-commitment exploration | Planning artifact | Execution model | Reviewer | Model routing |
|---|---|---|---|---|---|---|
| 0 | 1–3 pts, single file | skip | none | /dev:quick-feature |
mandatory task-completion-validator (one pass) |
sonnet executor |
| 1 | 3–8 pts | optional (use when ambiguity exists, skip when outcome is clear) | Feature Contract (~200–400 lines) | one autonomous sprint per contract | mandatory task-completion-validator |
sonnet executor + sonnet contract writer + Opus design block |
| 2 | 8–13 pts | strongly suggested — required when no comparable past-feature anchor exists or risk_level: high |
PRD + milestone Implementation Plan | milestone-by-milestone execution | mandatory task-completion-validator per milestone; one karen final-tree pass at feature end |
routing_constraints (MUST-stay classes, offload-eligibility, capability bar) — resolved at dispatch by delegation-router, never plan-time model ids |
| 3 | 13+ pts | strongly suggested — required when no comparable past-feature anchor exists or risk_level: high |
SPIKE + PRD + milestone Implementation Plan | milestone-by-milestone execution | mandatory task-completion-validator per milestone; one karen final-tree pass at feature end (+ a per-milestone karen only for context_class C3/C4) |
routing_constraints (MUST-stay classes, offload-eligibility, capability bar) — resolved at dispatch by delegation-router, never plan-time model ids |
The Reviewer column is the base gate — one lens — not the whole gate set. A second lens is added per-milestone only when that milestone's surface matches one of three triggers: it parses untrusted input, it is an authorization/identity boundary, or its effect is irreversible or leaves the system. Tier does not add lenses — a Tier 3 CRUD milestone gets one; a Tier 2 authorization milestone gets two. Classify per milestone and record
gate_lens+gate_lens_reasoninwave_plan.phases[](§5.4). Ruleset:dev-execution/references/gate-risk-classes.md§2.
Large-file override (capacity, not points): Story points size behavior; they don't size agent context. Any refactor that deletes, relocates, splits, or substantially rewrites a single file >~2K lines (>5K = always) is Tier 2 minimum regardless of point estimate. A Tier 1 single-agent sprint cannot hold the large source + its call-sites + edit targets at once and will blow context mid-sprint (observed: a 10,156-line deletion crashed a Tier 1 sprint with all wiring undone). Classify it as Tier 2 up front and decompose file-ownership-first per .claude/specs/workflows/large-file-refactor-decomposition-spec.md. Localized edits inside a large file (a few functions) are exempt.
How to apply:
- Estimate the feature in story points before creating any artifact.
- Select the tier from the table above. Then apply the large-file override: if the work moves/deletes/splits any file >~2K lines, force Tier 2 minimum.
- For Tier 2/3, check whether pre-commitment exploration is warranted (see "Workflow: Pre-Commitment Exploration" below).
- Follow the matching workflow (Tier 0 →
/dev:quick-feature; Tier 1 → "Workflow: Tier 1 Feature Contract"; Tier 2/3 → "Workflow 2: Create Implementation Plan from PRD"). - If scope expands during planning and crosses a tier boundary upward, promote — don't stretch. See promotion rule in the Tier 1 workflow.
Source: .claude/plans/tiered-workflow-overhaul.md §2.1
Execution-time git + model policy. Plans authored here execute under the canonical git workflow — a git worktree → PR to the parent branch → squash-merge on approval — defined in
../dev-execution/git-worktree-pr-protocol.md. Tier 2/3 plans carryrouting_constraints(MUST-stay-claude-primary classes, offload-eligibility, the capability bar per milestone) perreferences/plan-doctrine.md, never a plan-timemodel/effortpin —delegation-routerresolves the actual provider + model at dispatch time against the live registry (docs/agentic-operator/MODEL-ROUTING.mdis the underlying policy the router reads). Tier 0/1 artifacts (Feature Contract, quick-feature) may still set amodel/effortdefault directly — the pin-free rule is scoped to Tier 2/3 milestone plans, where the plan outlives any single day's model roster.
Research Routing — Bounded Research Through rf
Route SPIKE-substitute questions, H5 estimation anchors, and prior-art checks through Research
Foundry (rf) instead of ad hoc WebSearch/WebFetch — it produces a citable, evidence-backed run
instead of an unlogged web pass. Referenced from the Estimation Sanity Check (H5) below.
Local CLI (file-backed, workspace-discovery, CWD-sensitive):
rf capture "<bounded research question>" --sensitivity personal
rf triage inbox/raw_ideas/raw_<id>.md --create-intent --create-ibom
rf plan <intent_id> --depth medium --audience technical --max-cost 2
Node API (shared, :7432 — launch without a local rf checkout):
set -a; . ~/.config/research-foundry/serve.env; set +a
curl -s -X POST "$RF_API_URL/api/runs" -H "Authorization: Bearer $RF_TOKEN_AGENT" \
-H "Content-Type: application/json" \
-d '{"text": "<bounded research question>", "depth": "medium"}'
This is a look-first, advisory routing — never a blocking gate. Full contract: .claude/skills/rf/SKILL.md.
CCDash Frontmatter Requirements
Use CCDash-aligned frontmatter for all planning artifacts.
- Reference:
.claude/skills/artifact-tracking/schemas/field-reference.md - Baseline fields for all planning docs:
schema_version,doc_type,title,status,created,updated,feature_slug - Linkage fields:
prd_ref,plan_ref,related_documents - Lifecycle fields to update after implementation:
commit_refs,pr_refs,files_affected; on merge to the destination branch:merge_commit,merge_branch
Canonical Paths Table
All planning documents follow a canonical location pattern by doc type, enabling discovery and cross-referencing.
| doc_type | Purpose | Canonical Location | Feeds / Downstream |
|---|---|---|---|
exploration_charter |
Pre-commitment exploration boundary contract; contains hypothesis, deal_killer, timebox, legs, verdict | docs/project_plans/exploration/[idea-slug]/[idea-slug]-charter.md |
report (feasibility_brief), proposed ADR, prd (on go verdict) |
design_spec |
Pre-PRD ideation and design, varying maturity | docs/project_plans/design-specs/[name].md |
prd |
prd |
Formal product requirements | docs/project_plans/PRDs/[name]-v1.md |
implementation_plan |
implementation_plan |
Milestone-based technical plan (references/plan-doctrine.md) |
docs/project_plans/implementation_plans/[name]-v1.md |
phase_plan, progress |
phase_plan |
Single phase (if parent plan >800 lines) | docs/project_plans/implementation_plans/[name]-v1/phase-[N]-[title].md |
progress |
progress |
Phase task tracking and orchestration | .claude/progress/[feature-slug]/phase-[N]-progress.md |
— |
spike |
Formal research investigation with charter | docs/project_plans/SPIKEs/[name]-charter.md or docs/project_plans/SPIKEs/[name].md |
design_spec, prd, ADR |
report |
Investigation, audit, finding, post-mortem | docs/project_plans/reports/[category]/[name].md or .claude/findings/[name].md |
design_spec, prd |
meta_plan |
Workflow, process, or tooling change (not product) | .claude/plans/[name].md |
— |
human_brief |
Human-orchestrator lens: estimation rationale, wave strategy, OQ ledger, success behaviors | docs/project_plans/human-briefs/[feature-slug].md |
— (audience: humans; agents skip) |
Categories (PRD and implementation_plan subdirs): features, enhancements, refactors, harden-polish, infrastructure
Report categories (subdirs under docs/project_plans/reports/): findings, investigations, audits, post-mortems, refactor-reports
Exploration artifacts live under docs/project_plans/exploration/[idea-slug]/ — not under reports/. The feasibility_brief inside an exploration bundle uses doc_type: report with report_category: feasibility but is stored alongside its charter, not in the reports tree.
Cross-Reference Policy
Prefer envelope fields over ad-hoc fields for linking planning documents. This enables consistent discovery and prevents scattered linkage patterns.
Canonical linkage fields (prefer these):
prd_ref: Path to the PRD this design_spec or report is linked toplan_ref: Path to the implementation plan this phase_plan or progress is linked tospike_ref: Path to the spike this design_spec or PRD referencesrelated_documents: Array of paths to related docs (cross-references, background, context)
Legacy fields to migrate (phase out over time):
related_prds: OLD; useprd_reforrelated_documentsinstead- Scattered ad-hoc fields in existing docs that don't follow envelope schema
Migration strategy: When updating a design_spec or report with related_prds, refactor to use prd_ref (if single primary PRD) or move items into related_documents (if multiple cross-references).
Example:
# OLD (avoid):
related_prds:
- docs/project_plans/PRDs/xyz-v1.md
# NEW (correct):
prd_ref: docs/project_plans/PRDs/xyz-v1.md
# Multiple related docs:
related_documents:
- docs/project_plans/PRDs/xyz-v1.md
- docs/dev/architecture/adr-123.md
- .claude/context/some-pattern.md
Field Checklist by Doc Type
prd- Required now:
schema_version,doc_type: prd,title,status,created - Populate early:
feature_slug,priority,risk_level,owner,contributors - Keep
prd_ref: null; setplan_refafter implementation plan exists - Optional:
changelog_required: true— set when the feature introduces user-facing changes that must appear in CHANGELOG[Unreleased]before release. Omit (default: unset, treated as false) for purely internal or infrastructure-only changes. When set, Phase 7 Documentation Finalization must include a CHANGELOG entry. See.claude/specs/changelog-spec.mdfor categorization rules.
- Required now:
implementation_plan- Required now:
schema_version,doc_type: implementation_plan,title,status,created,prd_ref - Populate early:
scope,effort_estimate,feature_slug,priority,risk_level - Milestone-based plans (default,
milestone-plan-template.md) additionally setcontext_class(C1-C4) androuting_constraints— seereferences/plan-doctrine.md - Set
plan_ref: nullfor root implementation plan - If plan includes deferred items or research-needed items: populate
deferred_items_spec_refsas design specs are authored in the final phase; populatefindings_doc_refif a findings doc is created lazily during execution - Optional:
changelog_required: true— inherit from the parent PRD or set independently when the implementation scope confirms user-facing changes. When set, Phase 7 Documentation Finalization must include a CHANGELOG[Unreleased]entry. Default: unset (false). See.claude/specs/changelog-spec.md.
- Required now:
phase_plan- Required now:
schema_version,doc_type: phase_plan,title,status,created,phase,phase_title - Populate early:
prd_ref,plan_ref,entry_criteria,exit_criteria - Keep
feature_slugaligned with parent PRD/plan
- Required now:
spike- Required now:
schema_version,doc_type: spike,title,status,created - Populate early:
feature_slug,research_questions,complexity,estimated_research_time - Set
prd_ref/plan_refwhen spike is linked to planned work
- Required now:
human_brief- Required always:
schema_name: ccdash_document,schema_version: 2,doc_type: human_brief,title,status,created,audience: [humans],feature_slug,category: human-briefs - Required when linked docs exist:
prd_ref,plan_ref - Populate early:
owner,priority,confidence,feature_family,feature_version - Reserve but leave null:
intent_ref,epic_ref(forward-compat for INTENT.md system) - Do NOT set
blockedorsupersededstatus — use onlydraft,in-progress,completed - Full schema:
.claude/specs/artifact-structures/human-brief-spec.md§2
- Required always:
Frontmatter Lifecycle
Planning artifacts follow a structured lifecycle as they move through the SDLC. Frontmatter fields populate progressively at each phase.
Field Population Timeline
| Field | Draft | Approved | In-Progress | Completed |
|---|---|---|---|---|
title |
✓ | ✓ | ✓ | ✓ |
description |
✓ | ✓ | ✓ | ✓ |
status |
draft | approved | in-progress | completed |
created |
✓ | ✓ | ✓ | ✓ |
updated |
✓ | ✓ | ✓ | ✓ |
prd_ref |
null | ✓ | ✓ | ✓ |
plan_ref |
null | ✓ | ✓ | ✓ |
contributors |
[author] | [author] | [author + team] | [author + team] |
milestone |
null | ✓ | ✓ | ✓ |
commit_refs |
[] | [] | [refs...] | [refs...] |
pr_refs |
[] | [] | [refs...] | [refs...] |
files_affected |
[] | [] | [files...] | [files...] |
merge_commit |
null | null | null | <post-squash sha> |
merge_branch |
null | null | null | main (or destination) |
Lifecycle Phases:
- Draft: Initial creation with title, description, author. Status defaults to
draft. - Approved: PRD/plan review complete. Set status to
approvedand populate cross-references (prd_ref/plan_ref). - In-Progress: Execution begins. Add implementation team to
contributors, setmilestonetarget, trackcommit_refsas work commits. - Completed: All tasks done. Finalize
commit_refs,pr_refs, andfiles_affectedlist, and — once merged to the destination branch — setmerge_commit+merge_branchto the canonical landing SHA. For direct squash-merges with no PR,merge_commitis the only in-repo way to resolve where the feature actually landed (the branch SHA becomes an orphan).
Status Management:
Use manage-plan-status.py to advance status lifecycle:
python .claude/skills/artifact-tracking/scripts/manage-plan-status.py \
--file docs/project_plans/PRDs/feature-name-v1.md \
--status approved
Use update-field.py to append to list fields (--append "key=value"; lists: contributors, commit_refs, pr_refs, files_affected) or set scalar fields (--set "key=value", both repeatable):
# Append to a list field
python .claude/skills/artifact-tracking/scripts/update-field.py \
-f docs/project_plans/implementation_plans/feature-name-v1.md \
--append "pr_refs=https://github.com/owner/repo/pull/123"
# On merge to the destination branch, set the landing SHA + branch (scalar fields).
# For direct squash-merges with no PR, merge_commit is the only in-repo way to
# resolve where the feature landed (the branch SHA becomes an orphan).
python .claude/skills/artifact-tracking/scripts/update-field.py \
-f docs/project_plans/implementation_plans/feature-name-v1.md \
--set "merge_commit=4e64e630" \
--set "merge_branch=main"
Full field lifecycle details: .claude/skills/artifact-tracking/schemas/field-reference.md
Lifecycle Guidance
Planning artifacts follow a natural progression from ideation through implementation. Use this guide to determine when to create each document type.
Human Briefs are opt-in living documents that accompany PRDs and plans for qualifying features (≥8 pts, ≥2 phases, or notable orchestration complexity — see Workflow 5 heuristic). They live at docs/project_plans/human-briefs/[feature-slug].md alongside their linked PRD and plan, evolve throughout the feature lifecycle, and are archived in place when the feature ships. Unlike plans, briefs are not versioned — no -v1 suffix. See .claude/specs/artifact-structures/human-brief-spec.md §4 for the full heuristic.
Pre-Commitment Exploration → exploration_charter + feasibility_brief
When: You have a speculative idea or loosely-scoped initiative — before committing to a tier or authoring any planning artifact — and one or more of the following is true:
- No comparable past feature exists as an estimation anchor (H5 is unknown)
- The idea has
risk_level: highor involves a capability area the project has never built - The "should we even do this?" question has not been answered citably
- The requester is unsure whether to proceed or shelve
Where it sits in the lifecycle: Pre-Commitment Exploration is the upstream-most phase — before design_spec, before tier classification, before any PRD or Feature Contract. Its sole purpose is to produce a machine-readable verdict (go | no-go | conditional) that feeds directly into tier classification or archives the idea with rationale.
How the verdict feeds downstream:
go→ proceed to tier classification; thefeasibility_briefis referenced in the resulting PRD'srelated_documentsno-go→ archive theexploration_charteratdocs/project_plans/exploration/[idea-slug]/; idea is closed with documented rationaleconditional→recommended_next_actionfield in the feasibility brief names the concrete precondition and next command (/plan:exploreagain,/plan:spike, or defer-until condition)
Command: /plan:explore (see Workflow: Pre-Commitment Exploration below)
Artifacts produced:
exploration_charteratdocs/project_plans/exploration/[idea-slug]/[idea-slug]-charter.mdfeasibility_brief(doc_typereport,report_category: feasibility) atdocs/project_plans/exploration/[idea-slug]/[idea-slug]-feasibility-brief.md- Proposed ADR (optional, only if synthesis surfaces a decision that exists regardless of verdict direction)
Skip when: The idea is Tier 0 or 1 with a clear outcome, a directly comparable past feature exists, and risk_level is low or medium.
Rough Idea → design_spec
When: You have a raw idea, loose thoughts, or unstructured exploration on a potential feature or change.
What to do:
- Create a new file in
docs/project_plans/design-specs/[name].md - Set
maturity: ideain frontmatter - Add sections: problem statement (optional), open questions, explored alternatives
- This is your working document for shaping the idea
Example:
---
schema_version: 2
doc_type: design_spec
maturity: idea
title: "Real-time Sync Architecture"
status: draft
created: 2026-04-08
feature_slug: realtime-sync
---
Gaining Shape → maturity: shaping → maturity: ready
When: The design_spec has structure, you've explored trade-offs, and it's crystallizing into a concrete proposal.
What to do:
- Update the design_spec file
- Change
maturity: shaping(has structure, exploring) - Populate sections: problem_statement, open_questions, explored_alternatives
- Continue iterating until all open questions are resolved
- When ready to formalize, bump to
maturity: ready
Example:
maturity: shaping # Has structure, exploring trade-offs
# ... after resolving questions and alternatives:
maturity: ready # Ready to promote to PRD
Promote → Create prd
When: The design_spec is at maturity: ready and you're ready to formalize as a product requirement.
What to do:
- Create a new PRD at
docs/project_plans/PRDs/[name]-v1.md - Update the design_spec:
- Set
maturity: promoted - Add
prd_ref: docs/project_plans/PRDs/[name]-v1.md
- Set
- Reference the design_spec in the PRD as context/background
- Move forward with PRD lifecycle and implementation planning
Example:
# In design_spec:
maturity: promoted
prd_ref: docs/project_plans/PRDs/realtime-sync-v1.md
Workflow/Process/Tooling Change → meta_plan
When: You need to document a change to how the team works (process), tools used (tooling), or infrastructure changes (NOT a product feature).
What to do:
- Create a new file in
.claude/plans/[name].md - Set
doc_type: meta_planandscope: [process|tooling|workflow|infrastructure|documentation|other] - Document: what's changing, why, affects_skills, affects_commands, expected outcome
- This is distinct from product PRDs and tracks workflow improvements
Example:
---
schema_version: 2
doc_type: meta_plan
title: "Planning Document Cleanup"
scope: process
status: in-progress
affects_skills: [planning, artifact-tracking, plan-status]
---
Investigation/Audit/Finding → report
When: You discover something worth documenting (bug investigation, performance audit, learning, post-mortem) that informs product or process decisions.
What to do:
- For raw findings during execution, create in
.claude/findings/[name].mdwith minimal frontmatter (status: draft, source: agent) - When finding proves load-bearing, promote to
docs/project_plans/reports/[category]/[slug].mdwith full frontmatter - Link the report to the PRD or design_spec it informs via
prd_reforrelated_documents - Report categories:
findings,investigations,audits,post-mortems,refactor-reports
Example (raw finding):
---
schema_version: 2
doc_type: report
report_category: finding
title: "SQLAlchemy Comparator Cache Poisoning"
status: draft
source: agent
created: 2026-04-08
feature_slug: enterprise-db-layer
---
Example (promoted finding):
---
schema_version: 2
doc_type: report
report_category: finding
title: "SQLAlchemy Comparator Cache Poisoning"
status: accepted
source: agent
created: 2026-04-08
prd_ref: docs/project_plans/PRDs/enterprise-database-v1.md
promoted_to: [docs/project_plans/implementation_plans/enterprise-database-v1.md]
outcome: "Implemented manual cache refresh in enterprise repository tests"
---
design_spec Maturity States
Use the maturity field to track ideation progress:
| State | Definition | Next Step |
|---|---|---|
idea |
Raw ideation, loose thoughts | Explore and structure |
shaping |
Has structure, actively exploring | Resolve open questions |
ready |
Resolved questions, ready to promote | Create PRD |
promoted |
Has prd_ref, formalized to PRD | Use PRD for implementation |
shelved |
Not pursuing this idea | Archive if needed |
Core Workflows
Workflow: Pre-Commitment Exploration (/plan:explore)
Applies to: Speculative ideas and loosely-scoped initiatives where the "should we build this?" question has not been answered before any planning artifact is authored.
When to invoke:
- No comparable past feature exists as an estimation anchor (H5 unknown)
- Feature idea has
risk_level: highor introduces a capability area new to the project - The scope is ambiguous enough that tier classification itself is uncertain
- The requester is unsure whether to proceed, shelve, or defer
When to skip:
- Tier 0 or clear Tier 1 with obvious outcome and low risk
- A directly comparable past feature provides sufficient confidence
- The feature is an enhancement to existing, well-understood functionality
Command hint: /plan:explore [idea-description-or-file] [--timebox=N] [--legs=technical,value,risk,priorart] [--charter=path]
Output bundle (all artifacts land under docs/project_plans/exploration/[idea-slug]/):
docs/project_plans/exploration/[idea-slug]/
├── [idea-slug]-charter.md # exploration_charter (doc_type)
├── spikes/ # SPIKE outputs from /plan:spike legs
├── [idea-slug]-feasibility-brief.md # report (report_category: feasibility)
└── [idea-slug]-proposed-adr.md # ADR status: proposed (only when synthesis forces a decision)
Phase Flow
Phase 0: Triage (Opus, ~3K tokens)
— Does this idea warrant exploration or is a direct tier classification obvious?
— If obvious, skip to tier classification. If speculative, proceed.
↓
Phase 1: Charter (delegated to spike-writer / charter-writer in scoping mode)
— Produce exploration_charter with: hypothesis, deal_killer, timebox_days, investigation_legs
— Template: .claude/skills/planning/templates/exploration-charter-template.md
↓
Phase 2: Parallel legs (delegated; 1–4 SPIKEs in parallel via /plan:spike --leg-of=<charter>)
├── technical → spike-writer / research-technical-spike
├── value → ux-researcher / search-specialist
├── risk → backend-architect / data-layer-expert
└── prior-art → search-specialist / docs-seeker
— Leg catalog and agent routing: .claude/skills/planning/references/exploration-legs-catalog.md
↓
Phase 3: Synthesis (delegated to documentation-writer or spike-writer)
— Produce feasibility_brief (report, report_category: feasibility)
— Produce proposed ADR if synthesis surfaces an architectural decision
— Template: .claude/skills/planning/templates/feasibility-brief-template.md
↓
Phase 4: Verdict (Opus reasoning + mandatory user sign-off for go / no-go)
— go | no-go | conditional
— Handoff: go → /plan:plan-feature (feasibility brief in related_documents)
no-go → archive charter with rationale
conditional → recommended_next_action names the precondition
Token budget target: ~30–60K tokens end-to-end. Each parallel leg ~10K; synthesis ~5K; verdict ~3K.
Output Artifact Contracts
exploration_charter (frontmatter excerpt):
doc_type: exploration_charter
timebox_days: 3 # mandatory; hard max 7
hypothesis: "We believe X is worth building because Y."
deal_killer: "If Z is true, abandon." # mandatory
investigation_legs:
- id: tech
question: "Is X feasible in the existing architecture?"
assigned_to: spike-writer
verdict: null # populated at conclusion
verdict_rationale: null
feasibility_brief (reuses report doc_type, no new doc_type introduced):
doc_type: report
report_category: feasibility
verdict: go | no-go | conditional # mandatory structured field
verdict_confidence: 0.0–1.0
exploration_charter_ref: path
proposed_adr_ref: path | null
recommended_next_action: "/plan:plan-feature --tier=2" | "archive" | "defer-until: [condition]"
Required body sections: Synopsis, Investigation summary table (leg × confidence × conclusion), Cost estimate (H5 anchor), Value statement, Risks & blast radius, Architectural implications, Verdict, Citations.
Verdict Handoff Rules
| Verdict | Next action |
|---|---|
go |
Run /plan:plan-feature; add feasibility_brief path to PRD related_documents |
no-go |
Archive charter bundle at docs/project_plans/exploration/[idea-slug]/; no further action |
conditional |
recommended_next_action field names the exact next command and precondition; re-enter exploration loop when precondition resolves |
Human sign-off is required for go and no-go verdicts. Opus recommendation alone does not close the verdict.
Anti-Pattern Guards
| Anti-pattern | Guard |
|---|---|
| Endless investigation | timebox_days in charter is mandatory (default 3, hard max 7); Phase 2 must produce findings at cutoff — silence is not acceptable, partial findings + pivot is |
| Premature PRD | /plan:plan-feature Phase 0 should surface missing charter for speculative ideas and suggest /plan:explore first |
| Exploration without verdict | verdict frontmatter field is mandatory in the feasibility brief; status: concluded cannot be set without it |
| Siloed investigation | Phase 2 legs are spawned in parallel by default; sequential is opt-in via --sequential flag |
| ADR after commitment | ADRs drafted during exploration carry status: proposed; acceptance happens at the verdict phase, not at implementation |
| Missing deal-killer | deal_killer field in charter is mandatory; validator refuses to scaffold a charter without one |
| Verdict-as-prose | verdict and verdict_confidence are structured frontmatter fields, not body sections; tooling must be able to read them |
References:
- Leg catalog and agent assignments:
./references/exploration-legs-catalog.md - Charter template:
./templates/exploration-charter-template.md - Feasibility brief template:
./templates/feasibility-brief-template.md - Meta plan (full design):
.claude/plans/plan-explore-pre-commitment-exploration-v1.md
Workflow: Tier 1 Feature Contract
Applies to: Features estimated at 3–8 story points with a clear, bounded scope and enumerable acceptance criteria. Single-feature scope; does not require multi-phase orchestration.
Artifact: docs/project_plans/feature_contracts/[feature-slug].md
Template: .claude/skills/planning/templates/feature-contract-template.md
Why not a PRD + Plan?: A 5-pt feature costs ~150–200K tokens with the heavyweight flow. The Feature Contract delivers the same outcome at ~60–80K tokens through a single autonomous sprint rather than N batch-orchestration rounds.
Steps:
Opus drafts the contract design block (~15K tokens):
- Fill in
Goal,User/Actor,Job To Be Done,Scope,Acceptance Criteria,Risk Areas, andArchitecture Constraintsusing the template. - Set
tier: 1andestimated_points: Nin frontmatter. - Keep the design block to ~50–80 lines — Opus provides the judgment scaffold; sonnet expands the rest.
- Fill in
Delegate contract expansion to sonnet contract writer (prd-writer or feature-planner agent):
- Provide the Opus design block (file path) and the feature-contract-template.md (file path).
- The agent fills in
UX/Behavior Requirements,Data Requirements,API/Integration Requirements, andImplementation Notes. - Target: complete contract of 200–400 lines.
Opus sanity review (~3K tokens):
- Verify acceptance criteria are testable and unambiguous.
- Verify scope boundary is clear enough for an autonomous sprint.
- Verify risk areas are identified.
- Approve or send back for revision.
Hand off to autonomous sprint:
- Delegate the full contract to
feature-sprint-executor(sonnet,acceptEdits) using Mode C: Autonomous Feature Sprint. - Provide contract file path; the executor reads it directly.
- The executor implements the full feature: explores, codes, adds tests, validates, and produces a Completion Report.
- Delegate the full contract to
Mandatory reviewer pass:
task-completion-validatorreviews: contract acceptance criteria, validation results, and Completion Report.- Reviewer must pass before Opus commits.
- Reviewer output format: see
.claude/skills/dev-execution/validation/completion-criteria.md.
Opus commits if review passes.
Promotion rule (scope growth): If during contract drafting (steps 1–2) the estimated points cross 8, stop and promote to Tier 2. Author a PRD that references the draft contract via related_documents and create an Implementation Plan using Workflow 2. Do not retrofit a Tier 1 contract for genuinely complex work. Set prd_ref in the contract frontmatter pointing to the new PRD.
Total cost target: ~60–80K tokens, 3–4 prompt round-trips (contract draft → expansion → sprint → review).
Source: .claude/plans/tiered-workflow-overhaul.md §4.3–§4.4
Workflow 1: Create PRD from Feature Request
Input: Feature description or request from user
Process:
Analyze Request
- Extract feature name, scope, goals
- Identify related systems and components
- Determine priority and complexity
- Run the "Before You Scope" checks above (MeatyWiki → SkillMeat → deferred backlog → IntentTree) before drafting
Structure PRD
- Use template:
./templates/prd-template.md - Follow MP architecture patterns (see
./references/mp-architecture.md) - Include frontmatter with proper metadata — author the canonical plan frontmatter (
it_schema: 1) per./references/plan-frontmatter-schema.md: the templates emit the MUST set +open_questions/decisions(YAML lists) +agent_*/execution_mode/scores; lint withartifact-tracking/scripts/validate-plan-frontmatter.py(advisory). When IntentTree sync is in use, also carry the binding (intenttree_workspace/intenttree_tree) so capture resolves to the bound human workspace/tree (see.claude/rules/intenttree-integration.md) - Run the authoring-time gate —
python .claude/skills/artifact-tracking/scripts/check-plan-authoring.py <this-file>— right after writing the frontmatter. Advisory (FR-12/D-M4-1): it exits non-zero and names the file + field on a badstatusor a missingfeature_slug, but nothing consumes that exit code to block a commit or CI; treat it the same way as the status linter above. A missingitt_node_id/intenttree_treeis only a warning at this point — the tree may not exist yet - Organize into standard PRD sections
- Use template:
Add Implementation Context
- Break into phased approach
- Identify architectural layers involved
- Note dependencies and risks
- Define success criteria and acceptance tests
Determine Location
- Category:
docs/project_plans/PRDs/ - Categories:
harden-polish,features,enhancements,refactors - Naming:
[feature-name]-v1.md(kebab-case)
- Category:
Generate File
- Write PRD to determined location
- Include YAML frontmatter with metadata
- Link to related docs (ADRs, guides, etc.)
- Add to project tracking if needed
Output:
- PRD file at:
docs/project_plans/PRDs/[feature-name]-v1.md - Follows template structure
- Ready for implementation planning
Example:
Input: "Add real-time collaboration features to prompt editing"
Output Location: docs/project_plans/PRDs/realtime-collaboration-v1.md
Sections:
1. Executive Summary - Real-time collaborative editing
2. Context & Background - Current single-user editing limitations
3. Problem Statement - Users can't collaborate on prompts
4. Goals & Success Metrics - Multiple concurrent editors, conflict resolution
5. Requirements - WebSocket connections, operational transforms, presence indicators
6. Implementation Phases - Phase 1: Backend infrastructure, Phase 2: Frontend integration
... (full PRD structure)
Workflow 2: Create Implementation Plan from PRD
Input: Path to existing PRD or newly created PRD
Process:
Analyze PRD
- Read full PRD content
- Extract key requirements
- Identify architectural layers needed
- Determine milestone structure — which 3-4 reviewable end-states the work passes through
- Re-run the "Before You Scope" checks above if the PRD is new to this session (MeatyWiki → SkillMeat → deferred backlog → IntentTree)
Structure Milestones (default path —
references/plan-doctrine.mdrule 2)- Structure the plan around 3-4 coarse milestones. A milestone is a reviewable state of the system with checkable AC, not a batch of tasks — hand the executor the whole milestone.
- Enumerate tasks inside a milestone only where sequencing is load-bearing (migrations, serialization barriers, cross-repo handshakes) and name the reason at the point of enumeration. If you cannot name why the order matters, do not order it.
- Identify the critical path across milestones, if one genuinely exists — omit the section
otherwise (see the template's
## Sequencingguard). - The Phase Summary table and MP layered-architecture phase sequence (Database → Repository → Service → API → UI → Testing → Docs → Deployment) are retired for new plans — deleted, not deprecated; they duplicated what the milestones + AC matrix now own. In-flight plans that already carry a Phase Summary table finish under the rules they were authored on.
2.5 Opus Decisions Block — legacy/expanded path only. The default milestone path (step 2
above → template in step 3) does not use this step; a plan-doctrine-conformant plan is authored
directly against milestone-plan-template.md, no separate decisions-block/expansion pass.
Reserve this step for implementation-plan-template.md (in-flight plans, or an economy-class
executor that genuinely needs a pre-rendered task list rather than the dispatch-time render the
doctrine's "Model-conditional expansion" section describes):
- Opus authors a ~200-line decisions block using
./templates/decisions-block-template.md, covering phase boundaries, risk hotspots (severity + mitigation), estimation anchors, and dependency map. State routing as constraints (MUST-stay classes, offload-eligibility, per- phase capability bar) — never a model id or agent name;delegation-routerresolves both at dispatch (seerouting_constraintsin step 5 below). - Delegate expansion to
implementation-planner(sonnet): decisions block path + PRD path +implementation-plan-template.mdpath → detailed phase descriptions, task breakdowns, batch definitions, task tables, success criteria. - Opus sanity review post-expansion (~3K tokens): phase boundaries match the decisions block, no critical risks dropped, approve or send back for targeted revision.
- Source:
.claude/plans/tiered-workflow-overhaul.md§4.2
- Author the Plan
- Default:
./templates/milestone-plan-template.md— the doctrine-conformant Tier 2/3 template (milestones + AC-matrix + routing constraints; target <=150 lines, see "Prompt and Artifact Sizing" below). Use for every new plan. - Legacy/expanded:
./templates/implementation-plan-template.md— the 8-phase, task-table template. Reserve for in-flight plans continuing under their original rules, or an economy-class executor session per step 2.5. Do not choose it for a new plan by default.
- Default:
3.5 Run Estimation Sanity Check (mandatory) — write output to Human Brief, not the plan
- Use reference:
./references/estimation-heuristics.md - Determine if a Human Brief applies (see §4 creation heuristic in
.claude/specs/artifact-structures/human-brief-spec.md). - If brief applies: scaffold
docs/project_plans/human-briefs/[feature-slug].mdusing./templates/human-brief-template.md, then populate §2 Estimation Sanity Check in the brief with the H1–H7 output. - If brief does not apply (feature too small): populate the H1–H7 check in a comment or scratchpad for your own reference; do not add the full block to the plan.
- Apply heuristics H1–H7 bottom-up:
- H1: noun-counting (≥2 pts per new CRUD-with-RBAC table)
- H2: dual-implementation multiplier (~1.8× repo subtotal when local+enterprise)
- H3: algorithmic service flag (≥3 pts for any service whose description includes dependency / resolution / graph / conflict / cycle / solver / inference / ranking / scheduling / merge / diff / transform; SPIKE first if test scenarios cannot be enumerated)
- H4: bundle-vs-sum (per-area estimates summed = floor for plan total when ≥3 capability areas)
- H5: anchor reference (cite a comparable completed feature, justify any delta >30%; when no comparable feature exists, route the anchor question through
rfper the "Research Routing" subsection above rather than guessing) - H6: hidden plumbing budget (~15–20% line item for DTOs / DI / OpenAPI / RLS / inventory updates / CHANGELOG)
- H7: huge-file touch multiplier (≥2× a task's point estimate for any task whose
files_affectedincludes a file >2K lines — seereferences/estimation-heuristics.mdH7)
- If bottom-up total disagrees with top-down intuition, trust bottom-up or write justification.
- Set
**Human Brief**pointer line near the top of the plan (the template provides the field).
3.6 Assign Context Class per Milestone (mandatory, Tier 2/3)
- Points size human-scale scope; they do not size agent context. Assign each milestone a
context class C1–C4 — what actually predicts burn — per
references/plan-doctrine.md§ "Context class" (weigh write-risk surfaces, shared hot files, validation fan-out, design uncertainty, expected context footprint, and retry probability); the per-task analog is H7 inreferences/estimation-heuristics.md. - Record it in the milestone plan's
context_classfrontmatter field (single dominant class) or per-milestone in body prose when milestones span more than one class. - H7 above is the single-task instance of the same driver the context-class table generalizes — apply both; they are not redundant.
4-5. Declare Routing Constraints (default path — retires plan-time agent/model pins; references/plan-doctrine.md rule 3)
- Plans carry constraints, not identities. Author one
routing_constraintslist (plan-level frontmatter, or per-milestone when milestones differ) naming: which task classes MUST stay claude-primary (contractual, never a model id — e.g., "merge-path correctness MUST stay claude-primary"), which are offload-eligible, and the capability bar per milestone. delegation-routerresolves the actual provider + model per leg at dispatch time against the live registry (docs/agentic-operator/MODEL-ROUTING.md). Do not pre-assignAssigned Subagent(s)orModel: [model]; Effort: [level]per task in a new plan — a plan that pinned models was obsolete within days of authoring (the burn evidence behind this rule:docs/project_plans/design-specs/claude5-plan-doctrine-v1.md).- Deprecated, not deleted:
assigned_to(per-task subagent) andphases[].model/effortstill parse for in-flight plans authored under the old rules — do not strip them from a plan mid-execution. New plans simply do not emit them. - Legacy/expanded path (step 2.5 /
implementation-plan-template.mdonly): the old per-taskAssigned Subagent(s)(./references/subagent-assignments.mdmapping) andModel: [model]; Effort: [level]cells (./references/multi-model-guidance.md→ Canonical Effort Vocabulary) remain the authoring convention there — that template's task tables are rendered ahead of dispatch, so the cells still need filling in.
5.5. Required Artifacts Resolution
- Enumerate. From the routing constraints (step 4-5) above, plus any MCP/workflow/context
the plan needs, build the
required_artifactslist — plan-level frontmatter and/or per- milestone. Schema:./references/plan-frontmatter-schema.md§5.7. - Resolve against SkillMeat enterprise (look-first, per
.claude/rules/aos-operating-rules.md):skillmeat search "<name>" --json/skillmeat show <name> --type <t>. Setstatus:available(in catalog or already on-disk — fillskillmeat_ref),needs_creation(not found anywhere), orneeds_enhancement(found but insufficient for the task). - Route every non-
availableentry. Mirror the External Model Pre-Work Batchingbatch_0pattern above: insert an explicitbatch_0authoring/enhancement task before the milestone that consumes it, or — if it can't be resolved in-plan — a named blocker that halts the execute handoff below. Never leave aneeds_creation/needs_enhancemententry implicit. - Tag lifecycle + scope.
permanent(durable, project-wide — add to.claude/aos-artifacts.yamlif the project doesn't already carry it) orephemeral(scope: epic:<id>orplan:<feature_slug>, torn down by the dev-execution provisioning gate on completion). - Full authoring guide + worked example:
./references/required-artifacts-guidance.md— this step is the recipe, that doc is the reference; don't duplicate its content here.
Execute (Tier 2/3 handoff) — once the plan file is written and every required_artifacts
entry is available or covered by a batch_0 task / named blocker (step 5.5), emit the
execution-command handoff. Provider/model is a dispatch-time delegation-router decision, not a
plan-time field — the handoff no longer names an orchestrator model:
Execute:
/dev:execute-plan <plan-path>
Note any routing_constraints the operator should know before dispatch (MUST-stay classes,
named blockers) as a short follow-on line only when the plan carries any of note.
- UI Extraction Evaluation (UI-Heavy Phases Only)
- For phases with React/UI component work, evaluate against extraction criteria
- Flag reusable components with
[pkg]marker in task descriptions - Evaluate: multiple projects reuse (2+), generic API design, stability window (2+ weeks), no app-specific dependencies
- Document extraction candidates for potential
@meaty/uipackaging - Reference:
./references/ui-extraction-guidance.mdfor criteria details - Full spec:
.claude/specs/ui-package-extraction-spec.md
7.5 Deferred Items & Findings Planning
- Scan the PRD for deferred/backlog/research-needed items, open questions with
OQ-*markers, or spike-needed investigations - List them in a "Deferred Items" triage table in the plan's
## Deferred Items & In-Flight Findings Policysection - Add a corresponding design-spec authoring task row (DOC-006) for each item — or document "N/A — no deferred items" if none exist
- Initialize
deferred_items_spec_refs: []andfindings_doc_ref: nullin plan frontmatter - Reference:
./references/deferred-items-and-findings.md
Documentation Evaluation
- Assess which docs require updates based on feature scope:
- CHANGELOG: Include if user-facing changes (new features, breaking changes, deprecations). When
changelog_required: trueis set in frontmatter, a CHANGELOG[Unreleased]entry is mandatory in the Documentation Finalization phase before release. Categorization rules:.claude/specs/changelog-spec.md. - README: Include if features, CLI commands, screenshots, or version change
- User/dev docs: Include if behavior changes requiring user/developer knowledge
- Context files: Include if changes affect agent behavior or architectural patterns
- Project-level custom skills: Include if changes affect domain of a custom skill (new CLI commands, capability changes, workflow shifts); check the repo's skill roster for domain ownership (
.claude/specs/skills-index.mdin skillmeat; the skills dir +docs/ARTIFACT-UPSTREAM-REGISTRY.mdin AOS repos)
- CHANGELOG: Include if user-facing changes (new features, breaking changes, deprecations). When
- Create doc tasks for the Documentation Finalization phase:
- CHANGELOG →
changelog-generatoragent withchangelog-generatorskill - README/docs →
documentation-writeragent withmanaging-readmesskill - Context files →
documentation-writeragent (progressive disclosure: CLAUDE.md pointers only, detail in key-context) - Project-level skills →
ai-artifacts-engineer(SPEC.md + SKILL.md) anddocumentation-writer(workflows)
- CHANGELOG →
- Keep docs minimal/usage-focused, not verbose
- Reference:
./references/doc-finalization-guidance.mdfor detailed heuristics - Add "Model: haiku; Effort: adaptive" to doc tasks (or "Model: sonnet; Effort: adaptive" for skill SPEC updates — use
extendedonly if the SPEC authoring is unusually complex)
- Assess which docs require updates based on feature scope:
Check Plan Mass
- A doctrine-conformant milestone plan targets <=150 lines total (frontmatter included — see "Prompt and Artifact Sizing" below); if you're over, cut prose, not AC. This is a target, not a hard cap.
- 800 lines/file remains the hard ceiling for any planning doc (unchanged rule, scoped): if
a legacy-template plan or an unusually large milestone plan exceeds it, break into phase- or
milestone-specific files (
[feature-name]-v1/phase-[N]-[name].md, each <800 lines, parent links to them). See./references/optimization-patterns.md.
Generate Files
- Main plan:
docs/project_plans/implementation_plans/[feature-name]-v1.md - Phase files (if needed):
docs/project_plans/implementation_plans/[feature-name]-v1/phase-[N]-[name].md - Link phase files from parent plan
- Main plan:
9.5. Run the Authoring-Time Gate (advisory — FR-12/D-M4-1)
python .claude/skills/artifact-tracking/scripts/check-plan-authoring.py <main-plan-file>- Checks two things at the moment of authoring: the top-level
statusis a NodeStatus or a resolvable alias, and the plan carriesfeature_slug(the join key). Exit 2 names the file + field on a bad status or a missingfeature_slug— fix it before moving on. - Advisory only: this does not block a commit or CI, and no hook consumes its exit code.
A missing
itt_node_id/intenttree_treeis a warning, not a violation — the plan may legitimately be authored before its IntentTree binding exists (step 11 below creates it).
Seed the Delivery Dossier (default-on; Tier 2/3; non-blocking)
Create the feature's living dossier manifest now, from the plan you just wrote. This is the first link in the dossier lifecycle: the phase-boundary regeneration hook is binding-gated on this manifest existing, so a feature planned without a seed accretes no record at all.
DOSSIER_PLAN_FILE="docs/project_plans/implementation_plans/[feature-name]-v1.md" \ .claude/skills/dev-execution/hooks/seed-dossier.sh- Deterministic — never author this by hand and never spend a model call on it. The hook
derives the stage spine (
research→plan→ oneexecutestage per plan phase →validate) fromwave_plan.phases[]+ the plan's### Phase P1: …headings, and carries the plan'sopen_questions/decisionsfrontmatter into the dossier's OQ and decision logs. - Default-on, binding-gated, non-fatal, always exit 0 — same contract as the SDLC sync
(
.claude/rules/intenttree-integration.md). No plan file → silent no-op. Disable withAOS_DELIVERY_DOSSIER=0. - Tier 2/3 auto-seeds; Tier 0/1 on explicit request only (spec OD-4) — add
DOSSIER_SEED_FORCE=1when a smaller feature genuinely wants a longitudinal record. - Idempotent and safe to re-run: an existing manifest is left untouched, because it is the
accreting record — re-seeding would discard narratives authored during execution
(
DOSSIER_SEED_RESEED=1overrides, deliberately). - Output:
.claude/reports/dossier/<feature_slug>/{report.json,index.html}. Mention the path in your Next Actions table; execution takes it from there at each phase close.
Spec:
docs/skill-development/delivery-dossier/spec.md§A.1. Route detail: thedossierrow in "Status & Readiness Reporting" below.- Deterministic — never author this by hand and never spend a model call on it. The hook
derives the stage spine (
IntentTree SDLC Sync (default-on; binding-exists gate)
Workspace/tree resolution, the one-gate contract, and the human-vs-agent workspace rule are defined once in
.claude/rules/intenttree-integration.md— the single config-story indirection point. This section is the planning-time capture recipe that consumes that binding; do not re-derive the config here.This sync is enabled by default: unset,
1,true, orautoall mean enabled; only an explicit falsy value (0/false/no/off, case-insensitive) disables it. It is also a true no-op when no binding exists (noITT_NODE_ID/INTENTTREE_TREEand no plan-frontmatter binding) — so default-on never becomes noise in a repo with no IntentTree presence. When a binding exists and the sync is not explicitly disabled, run the following two-step sync after writing the plan file to disk. This applies equally to PRDs, Implementation Plans, and Feature Contracts.Binding in plan frontmatter (P1-T2). Author plans carry the binding so it is traceable and overrides the project default (D2): set
intenttree_workspace/intenttree_treein the plan's frontmatter (per./references/plan-frontmatter-schema.md§5.1). When absent, capture resolves to the project default in the integration rule (this repo: workspaceagentic-os, treeaos-intenttree).Target the HUMAN/PROJECT workspace (D3). Project plans capture into the project's human/project workspace (
kind != agent;agentic-os,kind=project, for this repo) — not an agent-kind scratch workspace. EnsureINTENTTREE_WORKSPACEresolves to it before applying.Step A — dry-run preview (always run first):
itt sync import <plan-file>Parses the artifact's YAML frontmatter (
tasks[],feature_slug,doc_type) and prints what would be registered and imported — no writes occur. Review the task count and frontmatter keys before proceeding.Step B — apply (after reviewing the preview):
# --tree resolves per the integration rule: plan frontmatter intenttree_tree → # project default (aos-intenttree / tree_01KVTH95FEG7Y23CA39T7BBSZJ) → $INTENTTREE_TREE. itt sync import <plan-file> --apply --tree "${INTENTTREE_TREE:-<repo-intenttree-tree-id>}"Registers the plan file as a
SourceArtifactand projects itstasks[]subtree onto the shared node in the repo's IntentTree tree. The CLI stamps the resultingintenttree_node(the bound node ID) andintenttree_tree(the target tree ID) back into the artifact's YAML frontmatter so the binding is traceable from the markdown file itself.Invariants (from the AWPR v2 contract):
- Markdown stays canonical — source→node only. The node tree is a derived projection.
Manual writeback (
WritebackPolicy: MANUAL) is the default; the node never overwrites the file. - Every import is idempotent: re-running with unchanged source is a no-op (no duplicate nodes).
- The step is best-effort / non-fatal when offline — if the IntentTree API is unreachable (e.g., rocket-fedora node is down), log the error and continue. Do not block plan authoring.
- Unknown frontmatter fields survive verbatim in
binding.raw_source_task.
References:
- Contract:
docs/project_plans/implementation_plans/awpr-v2-task-node-contract.md - CLI source:
client/src/intenttree_client/cli/commands/sync_cmd.py - Plan task: TASK-6.1 (FR-10, skill-wiring phase of AWPR v2)
- Markdown stays canonical — source→node only. The node tree is a derived projection.
Manual writeback (
Output:
- Implementation Plan at determined location (milestone-based by default; <=150 lines)
- 3-4 milestones, each with checkable AC and a
routing_constraintsblock - Linked phase files only if a legacy-template or oversized plan exceeds 800 lines
- AC -> command -> evidence matrix and success criteria per milestone
- Seeded delivery dossier (Tier 2/3):
.claude/reports/dossier/<feature_slug>/{report.json,index.html}
Example:
Input PRD: docs/project_plans/PRDs/realtime-collaboration-v1.md
Output:
Main Plan: docs/project_plans/implementation_plans/realtime-collaboration-v1.md
(milestone-plan-template.md; ~130 lines)
Milestones:
- M1 — Sessions and locks are durable: websocket_sessions + edit_locks tables, repository +
service layer land; a session survives a reconnect and a lock cannot be double-acquired.
AC: reconnect test passes; concurrent-lock test rejects the second acquirer.
- M2 — Edits converge under concurrency: operational-transform service + WebSocket/presence API
land; two concurrent editors on the same document converge to the same final state.
AC: N-client fuzz scenario (diamond-edit, out-of-order delivery) converges; no dropped ops.
- M3 — Reviewable in the product: collaborative editor UI + presence indicators land behind a
feature flag; a reviewer can drive the full flow end-to-end.
AC: manual E2E script passes; feature flag defaults off; CHANGELOG entry present.
routing_constraints:
- "Operational-transform correctness (M2) MUST stay claude-primary — no offload"
- "UI presence-indicator styling (M3) is offload-eligible"
Sequencing: M1 -> M2 (M2's service layer depends on M1's lock primitives) -> M3. Named because
the lock primitives are a real dependency, not because "database before UI" is a house style.
Workflow 3: Optimize Existing Plans
Input: Path to existing PRD or Implementation Plan that's >800 lines
Process:
Analyze Plan
- Read full plan
- Count total lines
- Identify natural break points (phases, sections)
- Determine optimal split strategy
Determine Breakout Strategy
- Primary: Break by phase (most common)
- Secondary: Break by domain (backend vs frontend)
- Tertiary: Break by task type (implementation vs testing)
- Goal: Each file <800 lines, logically cohesive
Create Breakout Files
- Pattern:
[plan-name]/phase-[N]-[name].md - Alternative:
[plan-name]/[domain]-tasks.md - Each file includes:
- Phase/section overview
- Relevant tasks with subagent assignments
- Quality gates for that section
- Links back to parent plan
- Pattern:
Update Parent Plan
- Add table of contents linking to breakout files
- Keep executive summary and overview in parent
- Replace detailed sections with links:
## Phase 2: Repository Layer See [Phase 2 Implementation Details](./[plan-name]/phase-2-repository.md) - Maintain quality gates summary in parent
Validate Optimization
- Each file <800 lines ✓
- All content preserved ✓
- Links work correctly ✓
- Logical grouping maintained ✓
- Progressive disclosure achieved ✓
Output:
- Optimized parent plan (summary + links)
- Breakout files for detailed content
- Improved token efficiency (95%+ reduction in single-load context)
Example:
Input: docs/project_plans/implementation_plans/harden-polish/sidebar-polish-v1.md (1200 lines)
Analysis:
- 8 phases, ~150 lines each
- Can group related phases: 1-3 (backend), 4-5 (frontend), 6-8 (validation)
Output:
Parent: sidebar-polish-v1.md (200 lines - summary + links)
Phase Files:
- sidebar-polish-v1/phase-1-3-backend.md (450 lines)
- sidebar-polish-v1/phase-4-5-frontend.md (400 lines)
- sidebar-polish-v1/phase-6-8-validation.md (350 lines)
Token Efficiency:
- Before: Load 1200 lines for any query
- After: Load 200-line summary, then specific phase (450 max) = 67% reduction
Workflow 4: Create Progress Tracking
Input: PRD or Implementation Plan
Process:
Utilize artifact-tracking skill to create progress tracking and context artifacts per the skill instructions.
You should NOT create these files from this skill, as there are specific optimizations and structures required by the artifact-tracking skill.
Workflow 5: Create Human Brief for Feature
Input: PRD path + Implementation Plan path (both required when they exist)
Spec reference: .claude/specs/artifact-structures/human-brief-spec.md
Process:
Check creation heuristic (§4 of spec) — create a brief when any of these are true:
- Feature is ≥8 story points estimated
- Implementation plan has ≥2 phases
- Estimation Sanity Check has non-trivial anchor comparison
- ≥2 deferred items with non-trivial rationale
- Feature spans ≥2 capability areas
- Notable orchestration complexity (wave coordination, cross-team dependencies) Skip when: quick feature (<5 pts, single phase), trivial refactor, single-file fix.
Scaffold the brief at
docs/project_plans/human-briefs/[feature-slug].md- Use template:
./templates/human-brief-template.md - No
-v1suffix — briefs are living documents, not versioned deliverables - Set
prd_ref,plan_ref,feature_slug,owner,status: draft
- Use template:
Populate on creation:
- §1 Context Pointers: one-line links to PRD, plan, design specs, SPIKEs
- §2 Estimation Sanity Check: migrate H1–H6 output from planning step 3.5
- §4 Open Questions Ledger: harvest
OQ-*markers from PRD and plan - §8 Expected Success Behaviors: extract human-verifiable outcomes from PRD acceptance criteria
Populate as information becomes available:
- §3 Wave & Orchestration Notes — after phase structure is finalized
- §5 Deferred Items Rationale — after triage table in plan is populated
- §6 Risk Narrative — after risk section in plan is written
- §7 What to Watch For — before or during execution
- §9 Running Log — append-only during execution
Set brief as in-progress when execution begins; completed when feature ships.
Output: docs/project_plans/human-briefs/[feature-slug].md
Agents must not load this file during execution (see Agent Consumption Rule below and spec §5).
Token Discipline (Planning Workflows)
These rules apply to all planning workflows in this skill. They codify the existing project-wide budget discipline for the planning context specifically.
Reference: .claude/rules/context-budget.md (global rules); .claude/plans/tiered-workflow-overhaul.md §4.9
The Feature Contract (or Decisions Block) Is the Delta
The Feature Contract (Tier 1) and the Opus Decisions Block (Tier 2/3) carry only the new decisions for this feature. All stable architectural context lives in durable docs and must not be restated in contracts or plans:
- Product intent:
intents/intent.md(when available) - Current system state:
docs/current-state.md(when available) - Architecture patterns:
docs/dev/architecture/*— link to these, do not copy from them - Agent operating rules:
CLAUDE.md
Do not restate what is already in durable docs. Provide a path reference instead.
Prompt and Artifact Sizing
| What | Target |
|---|---|
| Task prompts to subagents | < 500 words |
| Implementation Plan (Tier 2/3, milestone-based) | <=150 lines total, frontmatter included — references/plan-doctrine.md rule 4 |
| Opus decisions block (legacy/expanded path only) | ~200 lines |
| Tier 1 Feature Contract | 200–400 lines |
| PRD (per doc) | ≤ 800 lines; split into phase files if exceeded |
| Context passed to subagents | File paths, not file contents |
The 800-line figure elsewhere in this file (Key Benefits, Best Practices, optimization patterns) is the hard ceiling for any planning doc — the fallback that triggers a split. The 150-line figure above is the target specifically for Tier 2/3 milestone plans, reached by thinness (constraints and AC, not enumeration), not by splitting a large plan into smaller files.
Progressive Disclosure for Planners
When authoring contracts or decisions blocks, load context in this order — stop when you have enough:
- Contract or Decisions Block itself — the immediate planning surface.
- Relevant files — only files directly touched by this feature.
- Deep context docs (
key-context/, architecture docs) — only when blocked by an unresolved design question. - Historical plans — only to confirm comparable estimates; verify behavior from runtime truth (
openapi.json,symbols-*.json), not from old plans.
Anti-Patterns (with token cost)
| Anti-pattern | Cost | Correct approach |
|---|---|---|
| Opus reads a full PRD before delegating to prd-writer | ~7K tokens | Delegate comprehension; provide file paths only |
| Restating CLAUDE.md patterns in the delegation prompt | ~5K tokens | Reference CLAUDE.md by path |
Calling TaskOutput() for plan-writing agents |
~7.5K tokens | Check file on disk with Glob + Read |
| Exploring files Opus will hand to a subagent | ~3–10K tokens | Let the subagent explore its own context |
Reviewer Gates (Summary Pointer)
Reviewer-agent passes are mandatory at tier-appropriate checkpoints. Planning artifacts are not complete until the matching reviewer has signed off. What is mandatory is that a gate fires — not that a fixed set of lenses fires at it.
The base gate — one lens, every tier:
| Tier | Gate | Reviewer |
|---|---|---|
| 0 | End of the change | task-completion-validator |
| 1 | End of autonomous sprint | task-completion-validator |
| 2 | End of each phase | task-completion-validator |
| 2 | End of feature | karen (final tree, once) |
| 3 | End of each phase | task-completion-validator |
| 3 | End of feature | karen (final tree, once) |
| 3 | Plan-milestone boundary — context_class C3/C4 only |
karen |
A phase or sprint is not "complete" until the reviewer passes it. Do not commit before the gate clears.
Author for one lens. The ordinary plan is implement → tests → one review → ship: no pre-gate, no
second lens, no per-milestone karen. When authoring, only reach for the second lens where you can
name the trigger below — that is a planning-time judgment the plan records, not something execution
adds defensively.
The second lens — three triggers, nothing else
Add a second lens (security) to a milestone only when its surface matches one of exactly three
triggers. Record it in wave_plan.phases[] as gate_lens plus a mandatory gate_lens_reason:
gate_lens_reason |
The milestone's surface… |
|---|---|
untrusted-input |
parses input the caller controls — deserialization, request/query parsing, path or filename handling, template rendering with caller data, regex over caller input, uploads, URL/host parsing, archive extraction |
authz-boundary |
is an authorization or identity boundary — authorize/RBAC/policy/permission/guard, identity/principal/actor/session/tenant, tokens/nonces/confirmation/replay, isolation/sandbox/subprocess/tool-permission, secrets/credentials/redaction |
irreversible-outward |
has an irreversible effect, or leaves the system — publish/deploy, send to an external service, PR or issue creation, force-push, schema migration, secret rotation, data deletion, preview/writeback "must-not-execute" surfaces, CAS/atomicity/single-writer durability |
A two-lens milestone with no named trigger is a classification error, not a cautious default.
Once a trigger assigns the security lens it is never removable by budget or cost pressure.
Note the overlap with the Mode-D halt list (auth · payments/billing · schema migrations · data
deletion · secret rotation · infrastructure): Mode-D governs whether a human approves, these
triggers govern whether a second reviewer runs. They are different gates; a milestone can hit one
without the other.
Full ruleset and row-level signals:
dev-execution/references/gate-risk-classes.md §2.
Council Routing — ARC is the second lens, not a third pass
ARC is the security lens. When a milestone matches a trigger above — or a plan explicitly sets
review_intensity: council — the Agent Review Council pass is that milestone's second lens:
Skill("council-review")
Target the plan/PRD file as the council's object; write the run to runs/<date>-<feature-slug>/
per the skill's workflow, and record the run path in the plan's related_documents.
Changed 2026-07-31 (gate-tiering v4.1). This section previously made ARC additive — "both
task-completion-validatorandkarenstill run at their normal checkpoints; ARC is an extra pass." Onrisk_level: highthat produced three lenses per gate. ARC now occupies the second-lens slot rather than stacking on top of a full base set.risk_level: highalone no longer triggers it — the three surface triggers do. Risk level sizes the plan; the triggers classify the surface, and only the surface determines the lens count.The
validatorstill runs at its own checkpoint where the milestone genuinely has heavy AC bookkeeping in addition to a triggered surface — that is a deliberate judgment call recorded asgate_lens: [security, validator], not the default.
Full gate definitions and reviewer output format: .claude/skills/dev-execution/validation/completion-criteria.md
Source: .claude/plans/tiered-workflow-overhaul.md §4.5
Status & Readiness Reporting (delivery-report — forward routes + the dossier seed)
Planning is where the forward-looking report routes belong: program for epic/meta-plan status
and readiness for a go/no-go decision. These produce a rich, evidence-backed, shareable HTML
artifact where every open item carries a copyable agent handoff. They are recommended / on-request,
never blocking — a status snapshot is not a planning gate; skip it for a quick conversational
answer. Invoke Skill("delivery-report") and pick the route; the skill owns manifest → render →
validate. Route policy: .claude/skills/delivery-report/references/route-policy.md.
Planning also starts the one longitudinal route: dossier is seeded here and then accretes
through execution.
| Route | Planning moment | What it answers |
|---|---|---|
dossier |
Plan time, Tier 2/3 — seeded automatically by Workflow 2 step 10 (hooks/seed-dossier.sh), then written at each phase close |
"Where does this feature stand across its whole life — what's being done now, what's blocked, what was decided?" |
program |
An epic / meta-plan spanning multiple PRDs or waves — at kickoff, a milestone, or on a status ask | "Where is this whole initiative? What's blocked, what isn't, what's next on each open item?" |
readiness |
A go/no-go decision — the /plan:explore verdict (below), a tier-classification gate, or an epic investment checkpoint |
"Should we invest further — go or no-go?" |
Living per-feature record →
dossier, seeded at plan time. Do not hand-author the manifest and do not invokeSkill("delivery-report")for the seed — the deterministic hook derives it from the plan (Workflow 2 step 10). Skipping the seed is what leaves the execution-side regeneration hooks dormant, so the feature ends with no living record. Seeding it is not a gate: the enforced end-of-feature artifact stays thefeatureroute DoD report.Epic / meta-plan status →
program. For a multi-PRD initiative (see "Multi-PRD Planning" below) or an activemeta_plan, aprogramreport is the shareable rollup that complements the rawplan-statusmarkdown aggregation (plan-statusstays the canonical data source; delivery-report renders the stakeholder view). Subject = the epic/meta-plan slug.Go/no-go →
readiness. When a/plan:explorerun concludes (Phase 4 verdict) and a stakeholder-facing go/no-go artifact is wanted, produce areadinessreport. Thefeasibility_briefstays canonical; the report is the shareable presentation of the same verdict + evidence. See/plan:explore§ "Verdict & Handoff".
The backward feature route (a completed feature) is a dev-execution end-of-feature DoD gate,
not a planning-time artifact — see dev-execution/validation/completion-criteria.md.
Hosting/linking composes with, and is distinct from, the dossier. Once any route's HTML is
rendered, dev-execution/hooks/publish-report.sh (PF-3 M3) MAY host it in the atlas capsule store
and link it onto the bound IntentTree node — recommended/non-blocking, never a planning gate. The
dossier is the ONE living per-feature record (seeded here, accreted through execution, one
manifest per feature); publish+link is N per-scope hosted artifacts (one per feature/
program/phase/readiness/dossier report actually rendered) plus their IntentTree pointers —
a browsable index layer one level up, not a second dossier. Today only the dossier route's close
fires this automatically (dev-execution/modes/plan-execution.md §8); the forward routes above are
manually publishable via scripts/publish_report.py until their own close-hooks are wired. See
dev-execution/SKILL.md and .claude/rules/aos-operating-rules.md for the look-first/save-after
posture.
Next Actions Table (the standard close — every planning output)
Every planning response ends with a Next Actions table: the compact, copy-pasteable map of what
to do next — target command · path / ITT node / project · what it achieves · gates/blockers ·
recommended model · priority order. It is the always-on, inline projection of the delivery-report
handoff vocabulary (no HTML render required), and it is where the execute handoff you already emit
(the Execute: /dev:execute-plan <plan> string, the /plan:plan-feature --tier=N recommendation)
becomes a row — alongside a row per prerequisite spike and a deferred row per item the plan
parked (DOC-006 spec tasks; see references/deferred-items-and-findings.md). Emit the one-line empty
state when nothing follows. When a program / readiness delivery-report is also produced, keep
the table front-and-center in the response and list the report path as an artifact — the table is
not absorbed into the HTML.
Full format + per-command row semantics: dev-execution/references/next-actions-table.md (the
canonical spec, shared with the execution engine).
Templates Reference
prd-template.md
Location: ./templates/prd-template.md
Based On: /docs/docs-v2/templates/PRD-TEMPLATE.md
Purpose: Standard PRD structure for MeatyPrompts features
Key Sections:
- Feature Brief & Metadata (name, date, author, related docs)
- Executive Summary (1-2 paragraphs)
- Context & Background (problem space, current state)
- Problem Statement (clear gap or pain point)
- Goals & Success Metrics (measurable outcomes)
- Requirements (functional and non-functional)
- Scope (in-scope vs out-of-scope)
- Dependencies & Assumptions
- Risks & Mitigations
- Target State (post-implementation)
- Acceptance Criteria (definition of done)
- Implementation (phased breakdown with tasks)
When to Use: Creating any new PRD
milestone-plan-template.md — default for new Tier 2/3 plans
Location: ./templates/milestone-plan-template.md
Doctrine: references/plan-doctrine.md
Purpose: Thin, pin-free Tier 2/3 implementation plan — the doctrine-conformant default. Target <=150 lines total, frontmatter included.
Key Sections:
- Scope boundary (in / out, stated not silently dropped)
- Rubric ("what good looks like" — replaces step-by-step prescription)
- Named risks
- Milestones (3-4, each a reviewable state of the system with AC)
- AC -> command -> evidence matrix
- Sequencing (only if load-bearing — deleted otherwise)
routing_constraintsfrontmatter (MUST-stay classes, offload-eligibility) — no model idscontext_classfrontmatter (C1-C4, sizes agent context, not behavior)
When to Use: Any new Tier 2/3 implementation plan. See Workflow 2 step 3.
implementation-plan-template.md — legacy/expanded (in-flight plans, economy-executor path)
Location: ./templates/implementation-plan-template.md
Based On: /claude-export/templates/pm/implementation-plan-template.md
Purpose: Detailed phased implementation with task breakdown. Superseded by
milestone-plan-template.md for new plans (references/plan-doctrine.md) — retained for plans
already in flight under the old rules, and for the economy-class-executor expansion path
(Workflow 2 step 2.5).
Key Sections:
- Executive Summary (approach, milestones, success criteria)
- Implementation Strategy (architecture sequence, parallel work, critical path)
- Phase Breakdown (8 standard phases with task tables — retired for new plans)
- Risk Mitigation (technical and schedule risks)
- Resource Requirements (team composition, skills, infrastructure)
- Success Metrics (delivery, business, technical)
- Communication Plan (status reporting, escalation)
- Post-Implementation Plan (monitoring, maintenance)
When to Use: In-flight plans continuing under their original rules; a decisions-block →
implementation-planner expansion pass per step 2.5. Not the default for a new plan.
phase-breakdown-template.md
Location: ./templates/phase-breakdown-template.md
Purpose: Template for individual phase files when breaking up long plans
Key Sections:
- Phase overview (duration, dependencies, team)
- Task breakdown table (ID, name, description, acceptance criteria, estimate, assignee)
- Subagent assignments
- Quality gates
- Key files and integration points
- Link back to parent plan
When to Use: Breaking long implementation plans into phase-specific files
feature-contract-template.md
Location: ./templates/feature-contract-template.md
Purpose: Single-file artifact for Tier 1 features (3–8 pts) replacing the PRD + Implementation Plan pair
Key Sections:
- Goal, User/Actor, Job To Be Done, Scope (in/out)
- UX/Behavior Requirements, Data Requirements, API/Integration Requirements
- Architecture Constraints, Acceptance Criteria, Validation Requirements
- Risk Areas, Implementation Notes, Completion Report Required
Frontmatter includes: doc_type: feature_contract, tier: 1, estimated_points, changelog_required
When to Use: Tier 1 features; see "Workflow: Tier 1 Feature Contract" above
decisions-block-template.md
Location: ./templates/decisions-block-template.md
Purpose: Opus-authored scaffold (~200 lines) for Tier 2/3 features; defines phase boundaries, agent routing, risk hotspots, estimation anchors, dependency map, and model routing. Expanded by implementation-planner (sonnet) into the full plan.
Key Sections:
- Phase Boundaries (table: phase, name, scope, success criteria, exit gate)
- Agent Routing (primary + secondary per phase; parallel opportunities)
- Risk Hotspots (severity, rationale, mitigation per risk)
- Estimation Anchors (points per phase + comparable past feature)
- Dependency Map (critical path + mermaid graph)
- Model Routing (model + effort per phase per agent)
- Open Questions for Expansion (OQ-* markers for implementation-planner)
- Plan Skeleton Pointer (template path and output path)
When to Use: Any feature ≥ 8 pts (Tier 2 or 3); Opus authors directly before delegating to implementation-planner
Scripts Reference
All scripts are in ./scripts/ directory and use Node.js (NOT Python).
generate-prd.sh
Purpose: Generate PRD from feature request
Usage:
./scripts/generate-prd.sh "Feature description" "category"
Process:
- Parse feature description
- Determine category and filename
- Load PRD template
- Generate PRD content
- Write to
docs/project_plans/PRDs/[feature-name]-v1.md
Output: PRD file path
generate-impl-plan.sh
Purpose: Generate implementation plan from PRD
Usage:
./scripts/generate-impl-plan.sh "path/to/prd.md"
Process:
- Read PRD content
- Extract requirements and phases
- Generate task breakdown
- Add subagent assignments
- Determine if plan needs breakout (>800 lines)
- Write main plan and phase files
Output: Implementation plan file path(s)
optimize-plan.sh
Purpose: Break long plan into phase-specific files
Usage:
./scripts/optimize-plan.sh "path/to/plan.md"
Process:
- Read plan and count lines
- Determine optimal breakout strategy
- Create phase-specific files
- Update parent plan with links
- Validate all content preserved
Output: List of created phase files
References
estimation-heuristics.md
Location: ./references/estimation-heuristics.md
Purpose: Bottom-up sizing rules to prevent under-estimation. Codifies seven heuristics — noun-counting (H1), dual-implementation multiplier (H2), algorithmic service flag (H3), bundle-vs-sum check (H4), anchor reference comparison (H5), hidden plumbing budget (H6), huge-file touch multiplier (H7) — and the mandatory "Estimation Sanity Check" template every implementation plan must populate.
Used By: Implementation plan authoring (mandatory sanity check), plan-review skill (post-mortem heuristic tuning).
When to load: Always, when creating or reviewing an implementation plan estimate.
subagent-assignments.md
Location: ./references/subagent-assignments.md
Purpose: Mapping of task types to appropriate subagents
Used By: Implementation planning, progress tracking creation
file-structure.md
Location: ./references/file-structure.md
Purpose: Directory structure conventions for plans and progress
Naming Conventions:
- PRDs:
[feature-name]-v1.md(kebab-case) - Implementation Plans:
[feature-name]-v1.md - Phase Files:
phase-[N]-[name].mdorphase-[N]-[M]-[name].md(grouped) Used By: File creation, optimization
optimization-patterns.md
Location: ./references/optimization-patterns.md
Purpose: Patterns for breaking up long files into token-efficient chunks
Content:
Pattern 1: Break by Phase (Most Common)
- Split implementation plan by phase (1-3, 4-5, 6-8)
- Each phase file <800 lines
- Parent links to phase files
- Progressive disclosure: Load summary, then specific phase
Pattern 2: Break by Domain
- Backend phases (Database, Repository, Service, API)
- Frontend phases (UI, Components, State)
- Validation phases (Testing, Docs, Deployment)
Pattern 3: Break by Task Type
- Implementation tasks
- Testing tasks
- Documentation tasks
- Deployment tasks
Pattern 4: Keep Together
- Always keep in parent plan:
- Executive summary
- Phase overview table
- Risk mitigation summary
- Success metrics overview
- Move to phase files:
- Detailed task breakdowns
- Specific acceptance criteria
- Technical implementation notes
Token Efficiency Gains:
- Before: Load entire 1200-line plan
- After: Load 200-line summary + 400-line phase = 50% reduction
- For targeted queries: Load only relevant phase = 67%+ reduction
Used By: Plan optimization workflow
Plan Generator Rules (Mandatory)
Apply these rules whenever generating or reviewing an implementation plan or any phase that contains ACs. These rules are non-negotiable; they catch the class of integration/verification gaps documented in the motivating incident (ccdash-planning-reskin-v2-interaction-performance-addendum).
- R-P1 — No AC may contain the words "across", "everywhere", "throughout", "all X", or "visible" without an explicit
target_surfaces:list. If the AC uses any of these terms without enumerating concrete component paths, the plan generator must expand the AC inline. - R-P2 — Every new backend field X introduced in a phase introduces an implicit AC "FE handles missing X". If this AC is not already present, the generator writes it automatically. Resilience is a contract state, not a reviewer's courtesy.
- R-P3 — Every phase with ≥2 owner specialties (e.g., FE + BE) and overlapping
files_affected(intersection ≥1 file) must declare anintegration_ownerfield and at least one seam task. A seam task is a task whose sole purpose is to verify the cross-owner propagation contract. - R-P4 — UI-touching phases (any
*.tsxfile infiles_affected) must include a "runtime smoke" task in the verification phase. The smoke task must reference everytarget_surfacesentry from that phase.
AC schema for structured ACs (use this format whenever an AC covers multi-surface propagation or has resilience requirements):
#### AC [ID]: [Short description]
- target_surfaces:
# Use path strings (see §8 Q1 note in references/ac-schema.md).
- components/Planning/PlanningSummaryPanel.tsx
- components/Planning/PlanningGraphPanel.tsx
- propagation_contract: [how the value flows from producer to each surface]
- resilience: [how each surface behaves when the field is absent/null]
- visual_evidence_required: [screenshot spec, e.g. "desktop ≥1440px before/after" or false]
- verified_by: [list of task IDs in the verification phase that sign off this AC]
For the full AC schema reference and examples, see ./references/ac-schema.md.
Best Practices
File Size Management
Guideline: No file should exceed ~800 lines (hard ceiling, all planning docs). Tier 2/3
Implementation Plans additionally target <=150 lines from the start — see
references/plan-doctrine.md rule 4 and "Prompt and Artifact Sizing" above; that target is
reached by thinness, not by pre-emptively planning a split.
Rationale:
- Optimal token efficiency for AI context loading
- Enables progressive disclosure pattern
- Reduces cognitive load for agents
- Faster file parsing and analysis
Strategies:
- Break plans by phase when >800 lines
- Group short related phases (1-3, 4-5)
- Keep summaries in parent, details in phase files
- Use links for cross-references
Naming Conventions
PRDs: [feature-name]-v1.md
- Use kebab-case (lowercase with hyphens)
- Include version number (-v1, -v2)
- Descriptive name (e.g.,
advanced-filtering-v1.md)
Implementation Plans: [feature-name]-v1.md
- Match PRD naming
- Same category as PRD
- Version synchronized with PRD
Phase Files: phase-[N]-[name].md
- Sequential numbering (phase-1, phase-2)
- Can group:
phase-1-3-backend.md - Descriptive name (database, repository, frontend)
Directory Organization
PRDs:
docs/project_plans/PRDs/- Categories:
harden-polish,features,enhancements,refactors
Implementation Plans:
docs/project_plans/implementation_plans/- Match PRD category
- Phase breakouts in subdirectory:
[plan-name]/
Token Efficiency Tips
Progressive Disclosure:
- Summary in parent plan (200 lines)
- Link to detailed phase files (400 lines each)
- Agent loads summary first, then specific phase as needed
- 50-67% token reduction
Structured References:
- Link to ADRs instead of duplicating architecture info
- Reference existing docs rather than repeating
- Use relative paths for phase file links
Chunk by Logical Units:
- Keep related tasks together
- Don't split mid-phase
- Group short phases if logical
- Maintain quality gates with phases
YAML Frontmatter
PRDs:
---
title: "Feature Name - PRD"
description: "Brief summary (1-2 sentences)"
audience: [ai-agents, developers]
tags: [relevant, tags, for, search]
created: 2025-11-11
updated: 2025-11-11
category: "product-planning"
status: draft|published
related:
- /docs/architecture/ADRs/relevant-adr.md
- /docs/guides/relevant-guide.md
# changelog_required: true # Optional — uncomment for user-facing features requiring a CHANGELOG [Unreleased] entry
---
Implementation Plans:
---
title: "Feature Name - Implementation Plan"
description: "Brief summary of implementation approach"
audience: [ai-agents, developers]
tags: [implementation, planning, phases]
created: 2025-11-11
updated: 2025-11-11
category: "product-planning"
status: draft|in-progress|published
related:
- /docs/project_plans/PRDs/category/feature-name-v1.md
# changelog_required: true # Optional — inherit from PRD or set here; enforces CHANGELOG entry in Phase 7
---
Design Specifications (schema v2, pre-PRD ideation):
---
schema_version: 2
doc_type: design_spec
title: "Feature Idea Name"
description: "Brief description of what's being designed"
status: draft
maturity: idea
created: 2026-04-08
updated: 2026-04-08
feature_slug: kebab-case-slug
problem_statement: "Clearly articulate the problem being solved (optional for early ideation)"
open_questions:
- "Question 1 blocking clarity?"
- "Question 2 to explore?"
explored_alternatives:
- "Option A considered: pros/cons"
- "Option B considered: pros/cons"
related_documents: []
prd_ref: null
---
Maturity progression: Update maturity field as design_spec evolves: idea → shaping → ready. When promoting to PRD, set maturity: promoted and add prd_ref: docs/project_plans/PRDs/[name]-v1.md.
Meta Plans (schema v2, process/tooling/workflow changes):
---
schema_version: 2
doc_type: meta_plan
title: "Meta Plan Title (e.g., 'Planning Document Cleanup')"
description: "What process/workflow/tooling is changing and why"
status: draft
scope: process|tooling|workflow|infrastructure|documentation|other
created: 2026-04-08
updated: 2026-04-08
owner: nick
affects_skills: [skill-name-1, skill-name-2]
affects_commands: [/command:name-1, /command:name-2]
outcome: "Expected result or success criteria (optional)"
related_documents: []
plan_ref: null
---
Scope values: Use process for team procedures, tooling for tool changes, workflow for execution patterns, infrastructure for system/deployment changes, documentation for doc updates, other for miscellaneous meta-work.
Examples
Example 1: Create PRD for Advanced Filtering
Input:
User: "Create a PRD for adding advanced filtering to the prompts page. Users need to filter by multiple criteria: model, provider, date range, tags, and favorites."
Process:
- Extract feature name: "Advanced Filtering"
- Determine category: "features"
- Generate PRD using template
- Structure sections:
- Problem: Users can only filter by single criteria
- Goals: Multi-criteria filtering, saved filter sets
- Requirements: UI for filter builder, backend filter query support
- Phases: Phase 1 (Backend), Phase 2 (Frontend), Phase 3 (Saved Filters)
Output:
File: docs/project_plans/PRDs/advanced-filtering-v1.md
# Advanced Filtering - PRD
**Feature Name**: Advanced Filtering
**Date**: 2025-11-11
**Author**: Claude
**Related**: Filtering guides, search ADRs
## 1. Executive Summary
Enable users to filter prompts by multiple criteria simultaneously (model, provider, date range, tags, favorites) with the ability to save and reuse filter sets.
## 2. Context & Background
Current filtering supports single criteria only. Users frequently need to filter by combinations (e.g., "OpenAI models from last week tagged 'production'").
... (full PRD structure)
Example 2: Create Implementation Plan with Phase Breakout (legacy/expanded path)
This example predates
references/plan-doctrine.mdand illustrates the legacy phase-breakout path (in-flight plans / economy-executor use). For a new plan, see the milestone-based worked example in Workflow 2 above — default output is a single <=150-line file, no phase files.
Input:
User: "Create implementation plan for docs/project_plans/PRDs/advanced-filtering-v1.md"
Process:
- Read PRD, extract requirements
- Plan 7 phases following MP architecture
- Generate task breakdown with estimates
- Assign subagents to each task
- Calculate total: 1100 lines → needs breakout
- Create phase files:
- phase-1-3-backend.md (500 lines)
- phase-4-5-frontend.md (400 lines)
- phase-6-7-validation.md (300 lines)
- Update parent plan with links (200 lines)
Output:
Main Plan: docs/project_plans/implementation_plans/advanced-filtering-v1.md (200 lines)
# Implementation Plan: Advanced Filtering
## Phase Overview
| Phase | Title | Effort | Files |
|-------|-------|--------|-------|
| 1-3 | Backend Implementation | 18 pts | [Details](./advanced-filtering-v1/phase-1-3-backend.md) |
| 4-5 | Frontend Implementation | 12 pts | [Details](./advanced-filtering-v1/phase-4-5-frontend.md) |
| 6-7 | Validation & Deployment | 8 pts | [Details](./advanced-filtering-v1/phase-6-7-validation.md) |
... (executive summary, strategy)
---
Phase Files Created:
- advanced-filtering-v1/phase-1-3-backend.md (500 lines)
- Phase 1: Database (filter_sets table, indexes)
- Phase 2: Repository (query builder, filter sets repo)
- Phase 3: Service (filter validation, DTO mapping)
- advanced-filtering-v1/phase-4-5-frontend.md (400 lines)
- Phase 4: API (filter endpoints, saved sets API)
- Phase 5: UI (filter builder component, saved sets UI)
- advanced-filtering-v1/phase-6-7-validation.md (300 lines)
- Phase 6: Testing (unit, integration, E2E)
- Phase 7: Deployment (feature flags, monitoring)
Example 3: Optimize Existing Long Plan
Input:
User: "Optimize docs/project_plans/implementation_plans/harden-polish/sidebar-polish-v1.md - it's 1200 lines"
Process:
- Read plan: 8 phases, ~150 lines each
- Determine breakout: Group 1-3 (backend), 4-5 (frontend), 6-8 (validation)
- Create phase files:
- phase-1-3-backend.md (450 lines)
- phase-4-5-frontend.md (400 lines)
- phase-6-8-validation.md (350 lines)
- Update parent plan: Keep summary, add links to phase files (200 lines)
Output:
Updated: docs/project_plans/implementation_plans/harden-polish/sidebar-polish-v1.md (200 lines)
Created Phase Files:
- sidebar-polish-v1/phase-1-3-backend.md (450 lines)
Phase 1: Database - Sidebar state, user preferences
Phase 2: Repository - State management, RLS
Phase 3: Service - Preference sync, DTOs
- sidebar-polish-v1/phase-4-5-frontend.md (400 lines)
Phase 4: API - Endpoints for sidebar state
Phase 5: UI - Sidebar component, animations
- sidebar-polish-v1/phase-6-8-validation.md (350 lines)
Phase 6: Testing - Unit, integration, visual
Phase 7: Documentation - Component docs, API docs
Phase 8: Deployment - Feature flags, rollout
Token Efficiency: 67% reduction for targeted queries
Integration with Project Standards
Architecture Compliance
All plans follow project layered architecture.
Subagent Ecosystem
Plans integrate with 50+ project subagents:
Architecture: lead-architect, backend-architect, data-layer-expert Development: python-backend-engineer, frontend-developer, ui-engineer-enhanced UI/UX: ui-designer, ux-researcher Review: code-reviewer, task-completion-validator Documentation: documentation-writer, documentation-complex Testing: testing specialists Performance: react-performance-optimizer, web-accessibility-checker
Documentation Policy
Follows CLAUDE.md documentation policy:
- PRDs are product-planning docs (allowed)
- Implementation Plans are product-planning docs (allowed)
- NO reports, summaries, etc unless explicitly requested
File Organization
PRDs: /docs/project_plans/PRDs/[feature-name]-v1.md
Plans: /docs/project_plans/implementation_plans/[feature-name]-v1.md
Phase Files: [plan-name]/phase-[N]-[name].md
Advanced Usage
Customizing Templates
Edit templates in ./templates/ to match project needs:
PRD Template Customization:
- Add project-specific sections
- Adjust success metrics format
- Include standard acceptance criteria
Implementation Plan Template Customization:
- Add/remove phases
- Adjust quality gates
- Customize risk categories
Progress Tracking Template Customization:
- Add project-specific status values
- Adjust completion tracking format
- Include team-specific metadata
Multi-PRD Planning
For complex initiatives spanning multiple PRDs:
- Create parent epic document
- Generate individual PRDs for each component
- Link PRDs to parent epic
- Create unified progress tracking across PRDs
- For a shareable status rollup across the epic's PRDs/waves, produce a
programdelivery-report (see "Status & Readiness Reporting" above) — recommended at kickoff/milestones, not a gate.
Spike Integration
For research-heavy features:
- Create SPIKE document first (using spike-writer agent)
- Use SPIKE to inform PRD generation
- Reference SPIKE in PRD "Context & Background"
- Link SPIKE from Implementation Plan
Continuous Optimization
Regularly optimize plans as work progresses:
- Update progress tracking with actual completion
- Adjust estimates based on learnings
- Break out new sections if plan grows >800 lines
- Archive completed phases
Related Skills
- artifact-tracking: Create progress tracking and context artifacts
- skill-builder: Create new custom skills
- symbols: Token-efficient codebase indexing
- codebase-explorer: Fast pattern discovery
- explore: Deep codebase analysis
Related Agents
- lead-pm: SDLC orchestration
- prd-writer: PRD creation
- implementation-planner: Detailed implementation planning
- task-decomposition-expert: Task breakdown
- lead-architect: Architecture planning assistance, task delegation
- documentation-writer: Documentation for plans
Version History
See CHANGELOG.md for the versioned history of this skill.