narrative-arc-builder
Map raw project timelines, notes, research, and metrics into a five-stage evidence-backed narrative arc for a design case study. Use when a draft reads like a chronological task list, lacks tension or
SKILL.mdskills/narrative-arc-builder/SKILL.md
GitHubNarrative Arc Builder
Turn chronology into causal structure. Keep the user or operator as protagonist and the product, designer, and AI agent as supporting forces. This is a five-stage compression of Donna Lichaw's seven-part narrative arc (The User's Journey, Rosenfeld Media, 2016) — Exposition, Inciting Incident, Rising Action, Crisis, Climax/Resolution, Falling Action, End. Read references/five-stage-arc.md for the exact stage mapping.
Workflow
- Extract the protagonist, baseline, goal, inciting friction, constraints, evidence, alternatives, pivotal decision, changed state, and measured result.
- Map only supported material into:
- Context and baseline
- Friction or inciting incident
- Rising complexity and trade-offs
- Systemic breakthrough or pivotal learning
- Quantifiable aftermath and remaining limits
- Identify the climax as the moment value, risk reduction, or decisive learning became visible—not automatically the launch.
- Place research and process steps where they changed a decision.
- Preserve branches, failures, reversals, and unresolved evidence.
- Draft section headings that reveal the argument when read alone.
Do not manufacture conflict, call a shipped feature a breakthrough without evidence, or force a positive ending. When impact is unknown, end with the strongest verified learning and the measurement plan.
Output
Return a one-sentence thesis, the five-stage arc, a pivotal-decision statement, three evidence anchors, recommended headings, and unresolved gaps.
Example
Input:
Operators copied agent output directly until one incorrect batch affected 240 records.
We tested confirmation dialogs, full previews, and risk-tiered approvals. The risk-tiered
model cut routine review time while keeping destructive actions gated.
Expected outcome: an arc from fast but unbounded automation, through the 240-record incident and competing controls, to the risk-tiered approval decision and its measured review-time and safety evidence.