nasa-ms-7009

Knowledge base from NASA-STD-7009B (Standard for Models and Simulations) with implementation depth from NASA-HDBK-7009B. Use for M&S criticality and programmatics, development evidence and capability

SKILL.md

GitHub
<!-- argument-hint: [topic, facet, or chapter number] -->

NASA Standard for Models and Simulations (7009B + Handbook)

Source: NASA-STD-7009B (2024-03-05) with NASA-HDBK-7009B (2026-02-03) (US Government work, public domain) | Chapters: 7

When to use

Reach for this pack when establishing or reviewing credibility of models and simulations that inform NASA (or NASA-like) critical decisions — criticality/intended use, M&S life-cycle planning, development pedigree and permissible uses, V&V domains, uncertainty/sensitivity, use-phase appropriateness, results assessment, and decision-maker reporting with mandatory warnings and risk acceptance.

Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the core frameworks below.
  • With a topic — ask about criticality, capability assessment, V&V domains, uncertainty, permissible use, results reporting, or handbook phases.
  • With a chapter — ask for ch01 through ch07.

Supporting files: glossary.md, patterns.md, cheatsheet.md.

Core Frameworks & Mental Models

Two-document stack

  • STD-7009B: Mandatory M&S requirements (shalls) across programmatics, development, and use/reporting.
  • HDBK-7009B: Implementation handbook — life-cycle phases, compliance interpretation, model/AI pedigree context, PM/Technical Authority roles.

Three-phase requirement spine

  1. Programmatics — intended use, criticality, plan, metrics, acceptance criteria, reviews, defects.
  2. Development — RWS/pedigree, CM of data/software, units, assumptions, math, limits, permissible uses, capability assessment, guidance; plus V&V and development uncertainty.
  3. Use and reporting — proposed use, appropriateness, inputs, setup, envelope control, messages, results assessment, risk, decision reporting.

Dual credibility assessments

Assessment Primary phase Role
M&S capability Development / release How strong is the M&S product?
M&S results Use / analysis How credible is this analysis outcome?

Use chain

Intended use → (develop) permissible uses + V&V domains → (operate) proposed use + appropriateness assessment.

Reporting control

Decision briefings carry warnings, uncertainty+method, assessment outcomes vs thresholds, reviews, qualifications, records, and risk-acceptance rationale — not plots alone.

Chapter Index

# Section Key content
ch01 Scope, Criticality, Programmatics Intended use, criticality, plan, metrics, acceptance, reviews, defects
ch02 Development Evidence and Capability Pedigree, assumptions, limits, permissible uses, capability assessment, guidance
ch03 Verification and Validation Verify/validate shalls and domains of V&V
ch04 Uncertainty and Sensitivity Referent/model/use uncertainty; sensitivity records
ch05 Use and Results Assessment Proposed use, inputs, setup, envelope, messages, results assessment
ch06 Risk and Decision Reporting Analysis risk, mandatory warnings, report contents, acceptance
ch07 Handbook Life-Cycle Depth Phases, compliance, pedigree/AI, 7150.2 link, TA roles

Topic Index

  • Acceptance criteria / thresholds → ch01, ch06
  • AI / ML models as M&S → ch02, ch07
  • Assumptions and abstractions → ch02, ch06
  • Capability assessment → ch02, ch06, ch07
  • Criticality assessment → ch01
  • Decision-maker warnings → ch06
  • Defect / problem tracking → ch01, ch06
  • Domain of validation → ch03, ch05
  • Domain of verification → ch03, ch05
  • Input pedigree → ch05
  • Intended use → ch01
  • Life-cycle phases (handbook) → ch07
  • Permissible uses → ch02, ch05
  • Proposed use / appropriateness → ch05
  • Results assessment → ch05, ch06
  • Risk acceptance for M&S analysis → ch06
  • Sensitivity analysis → ch04, ch05
  • Technical Authority / PM roles → ch01, ch07
  • Uncertainty characterization → ch04, ch06
  • Units and coordinate frames → ch02
  • Verification → ch03
  • Validation → ch03

Supporting Files

  • glossary.md — M&S credibility terms with chapter references
  • patterns.md — implementation patterns (When/How/Trade-offs)
  • cheatsheet.md — spine, report must-haves, tells and smells

Scope & Limits

This pack covers NASA-STD-7009B (approved 2024-03-05) together with NASA-HDBK-7009B (2026-02-03) as synthesized reference notes from a two-PDF extraction (metadata pages 88 + 175 = 263 source_pages). It does not reproduce the full requirements compliance matrix verbatim, replace delegated Technical Authority direction, fully detail NPR 7150.2 software engineering requirements, or teach end-to-end probabilistic risk assessment methods (see nasa-pra / nasa-risk). US Government public domain work. No source-material download link is published.