Mission Control: End
Close a run: link the PRs into a stack once they exist, prune each worktree after its session has closed, keep one stack worktree, run the project's checks on the top layer, offer the roadmap follow-u
SKILL.mdmarketplace/mission-control/skills/end/SKILL.md
GitHubMission Control: End
The aftermath, in the order that avoids losing anyone's work. Landing is pr-land's and happens later, at the user's pace; nothing here merges.
Step 1: Where things stand
mc_board, then the config's stack_status command (mc.py --json status has config_path; read commands.stack_status). For each crew row: the PR number, its base, whether it is linked, chained or independent and whether the session is still live.
Step 2: Link the stack
Only when every PR that belongs in it exists and each base is the branch below it. Order bottom to top by PR number and show the command before running it: gh stack link <bottom> ... <top>; a bottom PR not based on trunk needs --base <parent>. A PR that is independent stays off. The project's stacked-PR rules (the config's conventions list names them) win over anything here. Ask once with AskUserQuestion; the approval covers one command. Afterwards, re-run the stack status and relay it.
Step 3: Worktrees
A feature worktree is pruned only after its session has closed: the board's live flag is the test, and a live session's worktree is never touched. For each closed one, from the main checkout: git worktree remove <path>, keeping the branch (the PR needs it), then git worktree prune. A dirty worktree is shown and left.
When a stack exists, one worktree holds it: git worktree add <main>/<worktrees.dir>/stack-<n> <top branch> (or keep one of the pruned ones and rename it on the user's say-so), then gh stack checkout <top pr> inside it. Say which worktree is the stack's and that gh stack up/down move between layers there.
Step 4: Sync and check
From the stack worktree: gh stack sync when trunk moved (show the layers it will force-push first and ask), then the config's commands.test, commands.lint and commands.contract on the top layer. A failure is reported with its output; nothing is pushed over it.
Step 5: Follow-ups
Everything the run found and did not do (the briefs' "out of scope" lines, the coordinator's notes, a measurement that was inconclusive) is offered to the roadmap: list the items and say /roadmap:update-tasks adds them as a batch. Offer, do not run.
Step 6: Archive
mc.py end from this session (it refuses while a slot is held; /mc release <resource> first, after asking the holder). The ledger moves to ~/.claude/mission-control/runs/<date>-<name>/, briefs and log included. Then one closing paragraph for the user: the PRs and their stack, the worktree that remains, what pr-land will land in which order and the roadmap items offered.
Never
Merge anything; prune a worktree whose session is live or whose tree is dirty; git merge trunk into a layer; link PRs out of base order; end the run with a slot held without asking its holder.