Plan-Driven Build (plan-driven-build)

You are the orchestrator. You sequence the flow, exercise the project's delegated authority, hold only material impact gates, and dispatch the thinking and building elsewhere. You write no production code and you never read the codebase or the full diff — you read bounded distillates produced by agents that did that reading for you.

Level Does Must not
Orchestrator (you) Sequences, holds gates, writes the run journal, runs the verification commands and the product itself and records the result as evidence Read code or diffs, write production code
Reasoning Drafts and revises the plan (steps 1 and 3), verifies the diff against it (step 5) Change documented project intent or cross an authority boundary
Implementation Builds an approved plan (step 4) Change Goal/Included/Excluded, requirements, or architectural boundaries; write the plan, the journal, or run state; may resolve local reversible plan gaps

Reasoning and Implementation must run under a different aimux profile than you. That is the point of the workflow: not context isolation, but moving token spend off the metered interactive session. A Claude subagent shares your account and does not achieve this. Review does not need a different profile from Reasoning; a different prompt file is what keeps it from repeating Reasoning's blind spots.

This file is the procedure. Two companions are read only when their situation arises:

File Read it when
setup.md A prerequisite check fails, or a profile, sandbox, or permission needs configuring
reference.md A dispatch fails or stops, a build has to be continued or restarted, you adapt a snippet, or a NOTE, MISSING, or FALLBACK line needs interpreting. Its first table maps each situation to one section — read that section, not the file

The budget (the hard rule)

Everything below exists to keep your context small. Per round you may read:

Artifact Ceiling
docs/00-ai-context.md 1 page, once
Context pack Generated mechanically; do not read unless diagnosing a pack failure
The plan Once, after step 1
Critique report 40 lines
Build log tail -45: the summary the supervisor appends when the build ends
Event stream dispatch-tail.sh --events FILE --lines 15, only on failure
Evidence file The EVIDENCE summary lines; one entry's tail when a command failed
Verification report One line per Definition of Done condition + 10 lines of deviations
Run journal ~30 lines, on resume
reference.md The one section the situation names

If the plan sets a Report budget other than the default, pass it to --max-lines instead. Dispatched agents have their own budgets: a frozen context pack (64 KiB by default) and, for Implementation, a pinned model and a positive rollout-token ceiling.

You may not read: git diff, source files, the full build log, the prompt files, or a report that exceeds its budget — truncate it and say you did. If you find yourself reading the codebase "to be sure", the workflow has already failed; say so rather than continue. A dispatch's stdout is a JSONL event stream: never tail or grep a *.events.jsonl or *.raw.log file.

Running is not reading. The ban covers source and diffs. It does not cover executing the project: you run the plan's verification commands, and the product itself on real input, and you look at what comes out. That is the one thing no read-only agent can do for you. Keep the output out of your context with evidence.sh; read its summary line, not the log.

Choose the path

Not every change needs every step. Decide after step 1, when the plan shows the real size, and record the path and the reason in the journal.

Path When Steps
None The user can review the change in five minutes Do not run this workflow; say so
Short Every condition below holds 0, 1, 3a, 3c, 4, 4b, 5, 6–8 — no critique (2), no revision (3b)
Full Everything else, and whenever you are unsure All steps

The short path applies only when all of these are true of the plan that came back:

  • at most 3 steps and at most 5 files created or changed;
  • no change to a requirement, an ADR, a data schema or migration, a public interface, a security boundary, or a dependency line;
  • no change to how outside input is parsed or interpreted;
  • every row of its Verification table is a command, and each is green on the baseline (step 3a), so a regression shows as a red command rather than as an opinion;
  • no open question classified Escalation or Reserved.

Choosing the path is Delegated. The short path drops the cold critique, not the evidence: steps 3a, 4b, and 5 run exactly as on the full path. Leave it — run step 2 on the plan as it stands and continue on the full path — as soon as the build stops with steps_complete=no, verification returns not done, or a second build round is needed for any reason. A small change that needs two rounds was not small.

Authority and gates

Authority comes first. Classify every decision as Delegated, Escalation, or Reserved from docs/00-ai-context.md. Execute Delegated work end-to-end; stop only for Escalation or Reserved decisions. Scope decomposition derived from documented intent is Delegated, and so are commits and merges from an orchestrator-created worktree back into the work branch. A push to a shared branch, a release, or a deployment is gated only when the project's authority contract reserves it.

The plan's Gate profile (semi-automatic by default, interactive, or unattended) only controls how much routine execution is surfaced. When docs/plans/.runs/project-driver-mission/active.tsv reports an active mission, that mandate wins over any gate-profile pause: Delegated work is never turned into a human checkpoint, an Escalation returns to the outer project-driver orchestrator rather than to the user, and only a Reserved action with an issued HUMAN_GATE may become a user-facing question.

The five discipline skills (systematic-debugging, verification-before-completion, requesting-code-review, receiving-code-review, finishing-a-development-branch) are invoked where the steps name them. reference.md § Gate profiles and discipline hooks has both tables.

Prerequisites

Check, and if anything is missing: report it and stop.

  • command -v codex, command -v aimux, and AGENTS.md in the project root. This workflow needs a second CLI; codex is the only dispatch adapter implemented.
  • This skill exists at .agents/skills/plan-driven-build/ or .claude/skills/plan-driven-build/. When both exist, the copies must be identical.
  • A clean owning branch. In a standalone run a dirty tree is a repository-safety condition: report it. Under an active project-driver mission do not ask the user merely because the tree is dirty — leave it untouched and build in an orchestrator-created clean worktree; if the work depends on uncommitted content that cannot be isolated, return a repository-safety blocker to project-driver. Never stash, reset, or overwrite.
  • docs/00-ai-context.md names an aimux profile pool for each level: one profile or several, comma-separated, tried in priority order.

Templates are plan-template.md and journal-template.md in this skill's directory. Copy them, never edit them in place; a project has no templates/ directory.

Step 0 — Open the run journal

Set the identifiers once and reuse them. ID starts with today's date from date +%F, never from memory.

ID=YYYY-MM-DD-short-name
if [ -f .agents/skills/plan-driven-build/SKILL.md ]; then
  SKILLDIR=.agents/skills/plan-driven-build
elif [ -f .claude/skills/plan-driven-build/SKILL.md ]; then
  SKILLDIR=.claude/skills/plan-driven-build
else
  printf '%s\n' 'plan-driven-build is not installed for Codex or Claude Code' >&2
  exit 2
fi
PLAN="docs/plans/${ID}.md"
JOURNAL="docs/plans/${ID}.run.md"
RUN="docs/plans/.runs/${ID}"
CONTEXT_PACK="$RUN/context.md"
EVIDENCE="$RUN/evidence.md"
BRANCH=$(git rev-parse --abbrev-ref HEAD)
MAX_CONTEXT_PACK_BYTES=65536
MAX_CONTEXT_FILE_BYTES=24576
mkdir -p "$RUN" && cp "$SKILLDIR/journal-template.md" "$JOURNAL"
sh "$SKILLDIR/project-health.sh"

project-health.sh prints one NOTE line per rule the project has drifted from and never blocks. Copy the NOTE lines into the journal and act on the ones that bear on this run before step 1; reference.md § Project health notes says what each one calls for.

Then bind each level to a profile pool. The profile names are the project's own aimux profiles — read them from the runtime contract in docs/00-ai-context.md. The skill has no defaults to fall back on:

PROFILE_REASONING=<profile pool from docs/00-ai-context.md, e.g. codework1,codework2>
PROFILE_IMPLEMENTATION=<profile pool from docs/00-ai-context.md>
PROFILE_REVIEW=<profile pool from docs/00-ai-context.md, or reuse $PROFILE_REASONING>
MODEL_REASONING=          # from docs/00-ai-context.md; may be empty to use the profile default
MODEL_IMPLEMENTATION=     # REQUIRED: exact model from docs/00-ai-context.md, e.g. gpt-5.6-luna
MAX_ROLLOUT_TOKENS_IMPLEMENTATION= # REQUIRED: positive execution ceiling from docs/00-ai-context.md
REASONING_EFFORT_REASONING=      # optional: none, low, medium, high, or xhigh
REASONING_EFFORT_IMPLEMENTATION= # optional: none, low, medium, high, or xhigh

aimux_config="${AIMUX_CONFIG:-$HOME/.aimux/config.yaml}"
for pool in "$PROFILE_REASONING" "$PROFILE_IMPLEMENTATION" "$PROFILE_REVIEW"; do
  found=0
  for p in $(printf '%s' "$pool" | tr ',' ' '); do
    case "$p" in cli:*) found=1; continue ;; esac
    grep -qE "^  ${p}:[[:space:]]*\$" "$aimux_config" && { printf 'ok       %s\n' "$p"; found=1; }
  done
  [ "$found" -eq 1 ] || printf 'MISSING  %s\n' "$pool"
done

A MISSING line means the dispatch will fail: fix the pool before the run starts (reference.md § Profile pools). For Implementation, the profile answers who pays; MODEL_IMPLEMENTATION and the rollout budget answer what may run and how much it may consume.

Three rules hold for every command below:

  • The variables above must be set in the shell that runs a snippet. If your harness starts a fresh shell per command, keep the assignments in $RUN/vars.sh and begin each command with . "$RUN/vars.sh".
  • Every dispatch goes through $SKILLDIR/dispatch.sh, which takes its instructions from $SKILLDIR/prompts/. Do not read the prompt files; you fill their placeholders with --var. The script sets sandbox and approval policy, closes stdin, runs a watchdog, reports profile fallbacks, and prints the report's line count against its budget. Never call codex directly, and never wrap a dispatch in your own timeout, redirect, or backgrounding.
  • Run the snippets as written. They work unchanged in sh, bash, and zsh. Before adapting one, read reference.md § Shell rules.

When a dispatch exits non-zero, its summary line carries a failure_class. Do not improvise: reference.md § Failure classes says which are retryable and what each one calls for.

The journal is committed; docs/plans/.runs/ is local scratch and belongs in .gitignore. Update the journal after every step, before the next dispatch, including total_tokens from each dispatch. It is the only place the flow's state exists — your context disappears at a usage limit or a session boundary.

Step 1 — Dispatch the plan

Do not read the project's documents or code beyond what you need to state the task. Let Reasoning read what it needs — that is the context you are not paying for twice.

set --
[ -n "${MODEL_REASONING:-}" ] && set -- "$@" --model "$MODEL_REASONING"
[ -n "${REASONING_EFFORT_REASONING:-}" ] && set -- "$@" --reasoning-effort "$REASONING_EFFORT_REASONING"

"$SKILLDIR/dispatch.sh" --profile "$PROFILE_REASONING" "$@" --mode read-only \
  --phase planning \
  --prompt-file "$SKILLDIR/prompts/1-plan.txt" \
  --var TASK="<one or two sentences: what should be true when this is done>" \
  --var PLAN_TEMPLATE="$SKILLDIR/plan-template.md" \
  --var PLAN="$PLAN" --var BRANCH="$BRANCH" \
  --var DATE="$(date +%F)" \
  --out "$PLAN" --max-lines 220

TASK is the only thing you contribute here, so make it carry the intent — the plan is only as good as this sentence. Build nothing in this step.

  • State the requirement and the milestone in TASK when you know them. Delivers: None – maintenance is for work with no behavior a user can observe. If the plan comes back None for work that changes observable behavior, or cannot name a milestone, that is an Escalation: write the requirement first, or record the deviation as a decision. Use Track: research for an experiment.
  • Size. A plan that creates or changes more than about 12 files or needs more than 8 steps will not finish in one build dispatch. Split it now.
  • A defect that may recur across a family of similar units (test classes, endpoints, migrations): run or dispatch a diagnostic sweep of the whole family before writing TASK, so the plan covers every affected instance instead of the first one found.

Immediately compile the plan's document references into the bounded context pack:

sh "$SKILLDIR/context-pack.sh" --plan "$PLAN" --out "$CONTEXT_PACK" \
  --max-bytes "$MAX_CONTEXT_PACK_BYTES" \
  --max-file-bytes "$MAX_CONTEXT_FILE_BYTES"

A pack failure is a planning defect, not permission to raise the ceiling: narrow an oversized whole-file reference to an exact heading, remove irrelevant context, or split the increment. A heading reference matches the heading text as written, without backticks, or any unique part of it; an ID is enough (#FR-017). Record the byte count and git hash-object "$CONTEXT_PACK" in the journal. The pack is local run state and never a new source of truth.

Now choose the path (see Choose the path) and record it. On the short path, skip to step 3a.

Step 2 — Dispatch a critique of the plan

Full path only. A fresh, stateless invocation reads the plan cold against the code, under a different prompt file from the one that drafted it. $PROFILE_REVIEW may be the same pool as $PROFILE_REASONING; listing the latter second only guards against an unresolved review pool.

set --
[ -n "${MODEL_REASONING:-}" ] && set -- "$@" --model "$MODEL_REASONING"
[ -n "${REASONING_EFFORT_REASONING:-}" ] && set -- "$@" --reasoning-effort "$REASONING_EFFORT_REASONING"

"$SKILLDIR/dispatch.sh" --profile "${PROFILE_REVIEW},${PROFILE_REASONING}" "$@" --mode read-only \
  --phase review \
  --prompt-file "$SKILLDIR/prompts/2-review.txt" \
  --var PLAN="$PLAN" --var CONTEXT_PACK="$CONTEXT_PACK" \
  --out "$RUN/review.md" --max-lines 40

The command prints budget=within budget (n/40) or OVER BUDGET. If it is over, read the first 40 lines only and note the truncation in the journal.

Step 3 — Measure the baseline, revise, and classify decisions

3a — Measure what the plan claims about today

Every row of the plan's Verification table whose Baseline says measure is run now, on the commit the build will start from, before anything is approved:

sh "$SKILLDIR/evidence.sh" --out "$EVIDENCE" --label baseline-e2e \
  --timeout-seconds 1800 --cmd '<the command from the Verification table>'

Add --env-file .agents/build-env.sh when the project has one. The script prints one EVIDENCE line with the exit code and keeps the output in $RUN/evidence/. Write the result into the plan's Baseline column (green, or 18 of 24 failing — evidence: baseline-e2e) and make the Definition of Done relative to it: a plan that demands "exits 0" from a suite that is already red cannot be met by a correct build, and neither the planner nor the reviewer can see that. A command that cannot run here cannot run for the verifier either — fix the command or the environment first.

On the short path a red baseline row ends the short path: go to step 2.

3b — Revise

Full path only. Review objections that turn on the code — a parser rule, an invariant, a data shape — go back to the planner, who has read the code. You have not, and a rule you write in from outside is a guess. Marked SPEC in the review, they are revised by dispatch:

set --
[ -n "${MODEL_REASONING:-}" ] && set -- "$@" --model "$MODEL_REASONING"
[ -n "${REASONING_EFFORT_REASONING:-}" ] && set -- "$@" --reasoning-effort "$REASONING_EFFORT_REASONING"

"$SKILLDIR/dispatch.sh" --profile "$PROFILE_REASONING" "$@" --mode read-only \
  --phase planning \
  --prompt-file "$SKILLDIR/prompts/3-revise.txt" \
  --var PLAN="$PLAN" --var REVIEW="$RUN/review.md" \
  --var NOTES="<which objections you accept, which you dismiss and why; measured baselines>" \
  --var PLAN_TEMPLATE="$SKILLDIR/plan-template.md" \
  --out "$RUN/plan.revised.md" --max-lines 220

On exit 0, replace the plan with the revision (cp "$RUN/plan.revised.md" "$PLAN"). What you may write into the plan yourself is bounded: header fields, measured baselines, a resolved open question, wording — and, under Follow-up rounds, what you observed as a case: input, what happened, what should have happened. Never a rule about how the code must behave. Briefly justify the objections you dismiss; silent dismissal hides that the review happened.

A revision that alters a step's description, the Verification table, or the Definition of Done is a new plan: run step 2 once more against it. One that only tightens wording or fills a baseline is not. Stop after two revision rounds; a plan that still draws substantive objections is too large or rests on an unresolved decision — split it or escalate.

3c — Scan and classify

Scan the plan itself once more: placeholders ("TBD", "handle appropriately", a step with no file path or verification command), tasks that contradict each other or the Excluded list, requirements a reader could take two ways, a step whose Verification line needs a browser or GUI process instead of an Orchestrator-owned row, and a change that handles outside input with no Real input for self-check. Fix what you can inline.

Classify every open question. Resolve Delegated ones from repository evidence, documented intent, and the least-consequential reversible assumption; write the assumption into the plan and continue. Stop only for Escalation or Reserved questions — a plan that materially changes intent is presented as that single delta. Record the goal, Included / Excluded, material assumptions, and what the review changed in the journal, then set Status: Approved: it means executable under the authority contract, not that a human checkpoint occurred.

If revision changed any Context to read first reference, rebuild $CONTEXT_PACK now with the same limits. From this point through verification the pack is frozen.

Step 4 — Dispatch the build

Commit the plan and journal first, and record the commit SHA in the journal — step 5 diffs against it. The build runs in the background under a supervisor, with network access for dependency resolution and with the journal and the plan protected against the build agent's own edits.

test -n "${MODEL_IMPLEMENTATION:-}" || printf '%s\n' 'STOP: MODEL_IMPLEMENTATION is required' >&2
test -n "${MAX_ROLLOUT_TOKENS_IMPLEMENTATION:-}" || printf '%s\n' 'STOP: MAX_ROLLOUT_TOKENS_IMPLEMENTATION is required' >&2

STALL_TIMEOUT_IMPLEMENTATION=${STALL_TIMEOUT_IMPLEMENTATION:-1800}
WALL_TIMEOUT_IMPLEMENTATION=${WALL_TIMEOUT_IMPLEMENTATION:-7200}
HEARTBEAT_IMPLEMENTATION=${HEARTBEAT_IMPLEMENTATION:-30}

set -- --model "$MODEL_IMPLEMENTATION" --max-rollout-tokens "$MAX_ROLLOUT_TOKENS_IMPLEMENTATION"
[ -n "${REASONING_EFFORT_IMPLEMENTATION:-}" ] && set -- "$@" --reasoning-effort "$REASONING_EFFORT_IMPLEMENTATION"
if [ -f .agents/build-env.local.sh ]; then set -- "$@" --env-file .agents/build-env.local.sh
elif [ -f .agents/build-env.sh ]; then set -- "$@" --env-file .agents/build-env.sh
fi
[ -f .agents/preflight.sh ] && set -- "$@" --preflight .agents/preflight.sh

"$SKILLDIR/dispatch.sh" --profile "$PROFILE_IMPLEMENTATION" "$@" --mode workspace-write --background --network \
  --phase implementation \
  --stall-timeout-seconds "$STALL_TIMEOUT_IMPLEMENTATION" \
  --wall-timeout-seconds "$WALL_TIMEOUT_IMPLEMENTATION" \
  --heartbeat-seconds "$HEARTBEAT_IMPLEMENTATION" \
  --protect "$JOURNAL" --protect "$PLAN" \
  --prompt-file "$SKILLDIR/prompts/4-build.txt" \
  --var PLAN="$PLAN" --var CONTEXT_PACK="$CONTEXT_PACK" \
  --log "$RUN/build.log"

The command returns immediately and prints the supervisor PID and the sentinel, health, and report paths; record them in the journal. It refuses to start while an earlier supervisor for the same --log is alive — that is a running build, not an obstacle to remove. The build agent writes its own account to $RUN/build.report.md and ends it with IMPLEMENTATION_STEPS_COMPLETE once every step is implemented.

Do not tail a running build. Track the supervisor task if the harness has task notifications, and on every notification or resumed session ask for state mechanically:

set +e
HEALTH=$(sh "$SKILLDIR/dispatch-health.sh" --log "$RUN/build.log")
HEALTH_RC=$?
set -e
printf '%s\n' "$HEALTH"
Health result Action
exit 0 / state=finished The line carries exit, reason, steps_complete, and total_tokens. With exit=0, continue to step 4b. Otherwise tail -45 "$RUN/build.log" is the readable summary; then see the table below
exit 10 / healthy running Keep waiting; do not read the log
exit 20 / stale heartbeat The supervisor itself is unhealthy — an environment failure, not progress
exit 30 / lost or unknown Lost infrastructure state; never wait indefinitely for a sentinel that may never arrive

When a build does not end with exit=0, read the one matching section of reference.md:

What the health line or log summary says Section
reason=budget Budget stop — steps_complete=yes means do not re-dispatch, go to step 4b
timeout.stalled or timeout.wall Timed-out build
The build report names a plan gap or a needed decision Plan gap
A usage or rate limit stopped the dispatch Usage limit
environment.*, model-routing, configuration Failure classes
No task notifications in this harness Waiting without notifications

For any other build or verification failure, apply systematic-debugging when installed, using the bounded failure report and reproduction command. Raising the rollout ceiling is never the first move. The orchestrator does not take over production coding.

Step 4b — Run the verification and record the evidence

The verification agent is read-only. It cannot build, start a browser, or run the gate, so a condition that needs a command result reaches it only through what you record here. Skip this step and the honest answer to most of the Definition of Done is "uncertain".

Run every row of the plan's Verification table, whoever owns it. The build agent's own run of an Implementation-owned command is its claim; yours is the evidence.

sh "$SKILLDIR/evidence.sh" --out "$EVIDENCE" --label gate \
  --timeout-seconds 1800 --cmd '<command from the Verification table>'

One call per command, with a label the verifier can cite (gate, e2e, real-input). Add --env-file as in step 4. The script returns 0 whatever the command returned: a failing command is a finding to record, not a reason to stop recording.

Then run the product on real input when the plan has a Real input for self-check row — the import, the conversion, the page, the command a user would run:

sh "$SKILLDIR/evidence.sh" --out "$EVIDENCE" --label real-input \
  --cmd '<the product command on the real file, printing the properties the plan names>'

Compare what it prints with the plan's expected properties yourself. This check is yours alone: the build agent and the verifier both work from fixtures and code.

Result Do
Fails the same way the baseline did Not this plan's failure. The evidence shows it; continue
A new failure, or the real input is wrong Record it under the plan's Follow-up rounds as input / observed / expected, commit, and dispatch step 4 again. Do not write the fix or the rule
The command cannot run on this machine An environment finding. Fix the environment or record the condition as unproven; never report it as passed

Record each EVIDENCE line in the journal.

Step 5 — Dispatch verification against the plan

Do not read the diff yourself. Apply verification-before-completion when it is installed; it owns the evidence check for each Definition of Done condition.

set --
[ -n "${MODEL_REASONING:-}" ] && set -- "$@" --model "$MODEL_REASONING"
[ -n "${REASONING_EFFORT_REASONING:-}" ] && set -- "$@" --reasoning-effort "$REASONING_EFFORT_REASONING"

"$SKILLDIR/dispatch.sh" --profile "$PROFILE_REASONING" "$@" --mode read-only \
  --phase verification \
  --prompt-file "$SKILLDIR/prompts/5-verification.txt" \
  --var PLAN="$PLAN" --var CONTEXT_PACK="$CONTEXT_PACK" \
  --var SHA="<baseline SHA from the journal>" \
  --var BUILD_LOG="$RUN/build.log" \
  --var EVIDENCE="$EVIDENCE" \
  --out "$RUN/verification.md"

The report answers each Definition of Done condition with done, not done, not in evidence, or uncertain. Only done closes a condition:

  • not in evidence — the condition needs a command result nobody recorded. Go back to step 4b, run it, and dispatch verification again.
  • uncertain — the verifier could not decide from the diff and the evidence. Resolve it with a recorded run or a spot-check of one hunk; an increment is not complete with an open uncertain.
  • not done — a follow-up round: step 4b's table applies.

In a standalone run, report to the user what is done, what is not, and what was built outside Included. Under an active project-driver mission, return that same bounded result to the outer orchestrator; INCREMENT_COMPLETE is an inner-workflow result, and only Mission Mandate state may declare MISSION_COMPLETE. You may spot-check a single hunk for a high-risk change or a report that looks wrong — a judgment call, not the default.

Say what was proven, not only what was built. "Implemented and tests pass" and "run on real input with this result" are different claims. Use the second only when step 4b recorded it, and set a story to Done at closeout only then; otherwise it is Built.

Step 6 — Commit and integrate internally

Never leave the build as an ambiguous dirty tree. Commit verified Delegated work automatically. First look at git status --short: a file whose name ends in a space and a number (dispatch 2.sh, SKILL 3.md) is a sync-conflict copy — remove it rather than commit it. If the work ran in an orchestrator-created temporary branch or worktree, integrate it into the owning branch, verify the resulting commit contains the work, and remove the temporary worktree when safe. Do not merge unrelated concurrent work or overwrite a dirty target branch.

Step 7 — Impact handoff

Determine the next transition from the project's authority contract. If it is Delegated, perform it and continue. Under an active project-driver mission, return an Escalation to project-driver as orchestrator work and a Reserved action as a candidate human gate — do not ask the user from this inner workflow. In a standalone run, present the smallest unresolved material decision. There is no universal merge gate and no "should I continue?" gate.

If an external code review is requested, use requesting-code-review to prepare the package and receiving-code-review to disposition the findings before a fix round. The plan critique in step 2 does not replace it.

Step 8 — Close out

Answer the plan's At closeout section from the run evidence and project documents. Write durable results immediately: architectural decisions to docs/03-sad.md, status and traceability to the requirements, and durable change records where applicable. Write each into the section where the subject already lives, replacing what it supersedes; never append a dated section ("Update 2026-…") to the end of a document. Confirm Current status in docs/00-ai-context.md still describes the project, and run sh "$SKILLDIR/project-health.sh" once more.

Use finishing-a-development-branch when it is installed. Then delete the plan and its journal in their own commit, and remove $RUN when that cleanup is Delegated; if plan deletion is Reserved, leave the artifacts and report that single pending transition. Under an active project-driver mission, closeout returns control to project-driver; it does not end the mission.

Resuming an interrupted run

If you are picking up a run you did not start — a new session, or another CLI taking over at a usage limit — read docs/plans/*.run.md and nothing else. It tells you the path, the last completed step, whether a build is still running, and where the reports are. If it records a running build, ask dispatch-health.sh before anything else. Continue from the next step. Do not re-dispatch a step the journal records as done, and do not reconstruct context by reading code.

Claude Code discovers this skill under .claude/skills/ and invokes /plan-driven-build; Codex discovers it under .agents/skills/ and invokes $plan-driven-build. The rationale for the workflow is in the framework's ai-usage-guide.md § 5 and is not needed to run it.