Stage Progression Oversight — PM's Methodology Bridge

Tasks don't advance themselves. The PO sets readiness. The methodology defines what each stage requires. But YOU monitor whether tasks are actually progressing — and when they stall, you act.

The Stage Lifecycle

conversation (0-20) → analysis (20-50) → investigation (50-80) → reasoning (80-99) → work (99-100)

Each transition requires:

  1. The current stage's work is done (artifact exists, criteria met)
  2. PO reviewed and confirmed (readiness advanced)
  3. Required contributions exist (for stories/epics entering reasoning/work)

Your job: monitor all three conditions for every active task.

What to Check Each Heartbeat

1. Stalled Tasks

A task that hasn't changed stage or readiness in 2+ heartbeat cycles is stalling.

How to detect:

  • Read your ASSIGNED TASKS section — check task_readiness and task_stage
  • Compare to what you remember from last cycle (or check trail events)
  • If readiness hasn't moved and no trail events → stalled

Actions by cause:

Cause How You Know What to Do
Agent waiting for PO Artifact exists, readiness unchanged Route to PO: fleet_gate_request or fleet_chat(mention="human")
Agent stuck on work In-progress but no commits or progress reports fleet_chat("Status on task X?", mention=agent)
Missing contribution Task in reasoning, no required contribution Call pm_contribution_check(task_id) → create missing contribution tasks
Unclear requirement Agent asked questions, no PO response Escalate: fleet_escalate(title="PO input needed for task X")
Agent offline Agent in SLEEPING/OFFLINE state Wait one cycle, then consider reassignment

2. Ready to Advance

A task whose stage work is DONE but readiness hasn't been updated yet.

Indicators:

  • Analysis stage: analysis_document artifact at 100% completeness → ready for investigation
  • Investigation stage: investigation_document with options explored → ready for reasoning
  • Reasoning stage: plan references verbatim, contributions received → ready for work
  • Work stage: fleet_task_complete called → now in review (automatic)

What you do:

  • Verify the artifact or deliverable exists
  • Verify PO has seen it (check for PO comments or directive)
  • If PO confirmed: advance readiness to next stage boundary
  • If PO hasn't seen: route to PO with summary

3. Contribution Gates

Before any story/epic advances to work stage, contributions must be complete.

The mandatory check:

pm_contribution_check(task_id)

This returns:

  • all_received: true → safe to advance to work
  • missing: ["design_input", "qa_test_definition"] → create contribution tasks

Never advance to work without this check. The engineer needs contributions in their context.

4. The 90% Gate

When readiness reaches 90%, a PO gate fires:

  • fleet_gate_request(task_id, "readiness_90", summary) → ntfy to PO
  • PO approves → readiness goes to 99 → dispatched for work
  • PO rejects → readiness stays or regresses → task needs revision

Package the gate with context: pm_gate_route(task_id) gathers plan status, contribution completeness, and readiness for the PO's decision.

Stage-Specific Monitoring

Conversation → Analysis (readiness 20)

  • Agent has understood requirements? (check for task comments with questions answered)
  • Verbatim requirement populated?
  • If vague after 2 cycles → escalate to PO

Analysis → Investigation (readiness 50)

  • Analysis document exists with findings?
  • PO reviewed findings?
  • Implications for the task are clear?

Investigation → Reasoning (readiness 80)

  • Investigation document has multiple options explored?
  • PO reviewed options?
  • Enough information to make a decision?

Reasoning → Work (readiness 99)

  • Plan references verbatim requirement?
  • All required contributions received? (pm_contribution_check)
  • PO confirmed the plan?
  • Gate approved?

Common Anti-Patterns

  1. Readiness inflation — PM sets readiness to 99 without contributions. Result: engineer works without design input, gets rejected.
  2. Stage skipping — Task goes from conversation to work because "it's clear enough." Result: no analysis, no investigation, weak implementation.
  3. Stale advancement — Task readiness was set 5 cycles ago but nobody's working on it. Result: context is stale when agent finally gets dispatched.
  4. PO bottleneck — Multiple tasks waiting for PO review. Result: fleet stalls. Batch PO gates together and escalate proactively.

The Dispatch Connection

When you advance readiness to 99%, the orchestrator's dispatch step picks it up:

  1. Orchestrator reads task with task_readiness >= 99 and task_stage = work
  2. Budget check → storm check → doctor check → router selects model
  3. Context refresh: writes task-context.md with stage instructions + contributions
  4. Agent wakes and sees the task with FULL context

Your readiness advancement IS the dispatch trigger. Setting it correctly — with contributions verified, plan confirmed, PO gate approved — is what makes dispatch work.