The Problem This Solves

An epic that goes straight to "create 5 stories" produces stories that overlap, miss critical paths, and have invisible dependencies. Three sprints later the team discovers a blocker that should have been visible from day one.

Good epic breakdown is ANALYSIS, not transcription.

Step 1: Understand the Whole Before Splitting

Before creating a single subtask:

  1. Read the verbatim requirement — what did the PO actually ask for?
  2. Identify the user outcome — what changes for the user when this is done?
  3. Map the system boundary — which systems are touched?
  4. Identify the risk center — where is the unknown? Where will things break?

The risk center is where you start, not the easy parts.

Step 2: Identify Natural Seams

Epics split along natural boundaries:

Seam Type Example Signal
Data boundary "User model" vs "Auth flow" Different tables/APIs
System boundary "Backend API" vs "Frontend form" Different codebases
Role boundary "Security review" vs "Implementation" Different expertise
Risk boundary "New tech spike" vs "Known pattern" Different uncertainty
User flow "Registration" vs "Login" vs "Password reset" Different user actions

Anti-pattern: Splitting by layer ("do all models first, then all APIs, then all UI"). This creates stories that can't be demo'd or validated independently.

Step 3: Build the Dependency Chain

For each story, ask:

  • What MUST exist before this can start?
  • What does this PRODUCE that others need?
  • Can this be worked on in parallel with anything?

Draw the chain:

Epic: User Authentication
  ├── Story 1: User model + migration (no deps — foundation)
  │   └── Contribution: architect design_input
  ├── Story 2: Registration API (depends on Story 1)
  │   └── Contributions: architect, QA, devsecops
  ├── Story 3: Login API (depends on Story 1)
  │   └── Contributions: architect, QA, devsecops
  ├── Story 4: Password reset (depends on Story 3)
  │   └── Contributions: QA, devsecops
  └── Story 5: Frontend integration (depends on Stories 2+3)
      └── Contributions: UX, QA

Stories 2 and 3 can run in parallel. Story 4 and 5 cannot start until their dependencies are done. This is what the PM should see BEFORE creating tasks.

Step 4: Set Contribution Requirements

For each story, check the synergy matrix:

Story Type Always Needs Sometimes Needs
New feature architect, QA devsecops, UX, writer
Bug fix QA architect (if architectural)
Refactor architect, QA devsecops (if auth-related)
Infrastructure devops, devsecops architect
Documentation writer UX (if user-facing)

Create contribution subtasks when creating the story — don't wait.

Step 5: Estimate

Points Meaning Typical Duration
1 Trivial, known pattern < 1 heartbeat
2 Small, mostly known 1-2 heartbeats
3 Medium, some unknowns 2-3 heartbeats
5 Significant, real complexity 3-5 heartbeats
8 Large, multiple unknowns Full sprint
13 Epic-sized, should be split further Split this

If you estimate 13, you haven't broken it down enough.

Common Mistakes

  1. Stories too large — if a story can't be completed in one sprint, split it further
  2. Missing the spike — if you don't know HOW to do something, the first story should be a spike to find out
  3. Hidden dependencies — "oh we need that service deployed first" — map infrastructure dependencies explicitly
  4. No contribution tasks — creating stories without architect/QA/security input means the engineer will make mistakes
  5. Splitting by layer — "all backend, then all frontend" means nothing is demo-able until everything is done

The Group Call

pm_epic_breakdown(task_id)

This call reads the epic, checks existing subtasks, and helps you identify gaps. Use it as a starting point, not a replacement for thinking.