swppp
Drafts a Stormwater Pollution Prevention Plan (SWPPP) compliant with 40 CFR Part 122, EPA Construction General Permit (CGP), and applicable state NPDES requirements for construction projects disturbin
SKILL.mdskills/swppp/SKILL.md
GitHubStormwater Pollution Prevention Plan (SWPPP)
Produces a construction SWPPP covering site characterization, BMP selection, inspection schedules, recordkeeping, and operator certification under the Clean Water Act NPDES program.
Prerequisites
- Project details — name, location (coordinates or legal description), total disturbance acreage, timeline
- Operator identification — entity with day-to-day operational control
- Site characterization — soil types, topography, drainage patterns, existing vegetation
- Receiving waters — all water bodies receiving discharge, distance/direction, 303(d) or TMDL status
- Environmental features — wetlands, endangered species habitat, historic properties within or adjacent to site
- Existing permits — NPDES permit number, state CGP, MS4 requirements
- Site plans / grading plans — if available
Output Structure
1. Cover Page & Certifications
| Element | Requirement |
|---|---|
| Project name & NPDES permit # | Required |
| Operator name, address, contact | Required |
| Preparer name & qualifications | Required |
| PE seal | If required by state |
| Signature block | Operator or authorized representative — name, title, date |
| Certification language | Full 40 CFR 122.22 certification language |
2. Site Description
- Project narrative (scope, phases, timeline)
- Total site area vs. disturbance area
- Soil types (reference NRCS Web Soil Survey)
- Pre- and post-construction drainage patterns
- Receiving waters table:
| Receiving Water | Classification | 303(d) Listed? | TMDL? | Distance from Site |
|---|---|---|---|---|
| {name} | {class} | Y/N | Y/N | {ft/mi, direction} |
- Endangered species / historic preservation eligibility determination
3. Best Management Practices (BMPs)
Organize into three categories. For each BMP, specify location, install timing, design spec, and maintenance requirement.
Erosion & Sediment Controls — silt fence, sediment basins (3,600 cf/acre or state requirement), inlet protection, stabilized construction entrances (min 50 ft × 20 ft, 6" stone), temporary seeding for areas inactive >14 days.
Good Housekeeping & Pollution Prevention
| Practice | Standard |
|---|---|
| Material storage | Secondary containment for liquids; covered erodible materials |
| Concrete washout | Lined, bermed, ≥10 ft from drainage; no direct discharge |
| Spill prevention | Kits within 50 ft of fuel/chemical storage; report per state thresholds |
| Waste management | Dumpsters covered; hazmat manifested per RCRA |
| Sanitary waste | Licensed portable facilities; serviced weekly minimum |
| Vehicle maintenance | Drip pans required; fluid changes only over containment |
Stabilization Practices
| Condition | Deadline | Method |
|---|---|---|
| Inactive areas | 14 days from last disturbance (7 days if impaired water) | Temporary seed, mulch, or erosion blanket |
| Final grade reached | Per CGP (typically 14 days) | Permanent seed + mulch or sod |
| Steep slopes (>3:1) | Immediately after grading | Erosion control blanket + seed |
4. Inspection & Monitoring
Schedule
| Trigger | Frequency |
|---|---|
| Routine | Every 7 calendar days during active construction |
| Storm event (≥0.5 in.) | Within 24 hours after discharge ends |
| Reduced (if CGP allows) | Monthly when temporarily stabilized |
Inspector: Qualified person with SWPPP/BMP/CGP knowledge. States may require CPESC or equivalent.
Each inspection must document:
- All BMPs operational and maintained
- No off-site sediment discharge
- Slopes and disturbed areas assessed
- Sediment levels at basins/traps
- Construction entrances functioning
- Material storage properly contained
- New discharge points identified
- Prior corrective actions completed
Corrective actions: Initiate within 24 hours; complete before next storm or within 7 days, whichever is sooner.
5. Recordkeeping
| Record | Retention |
|---|---|
| Current SWPPP | Permit duration + 3 years; on-site or readily accessible |
| Inspection reports, rainfall data, BMP maintenance logs | 3 years after Notice of Termination (NOT) |
| SWPPP amendments (all versions) | 3 years after NOT |
| Training records, agency correspondence | 3 years after NOT |
6. Amendments
SWPPP is a living document. Amend when:
- BMPs prove ineffective
- Site conditions change (new phases, redesign)
- Inspections reveal new pollutant sources
- Agency directs changes or operator changes
Log each amendment with date, description, and responsible party.
7. Personnel & Training
- Identify SWPPP administrator by name and contact
- All BMP personnel: initial training + annual refresher
- Topics: SWPPP requirements, BMP installation/maintenance, spill response, reporting obligations
8. Appendices
- A: Site maps (existing conditions, grading, BMP locations, drainage areas)
- B: BMP detail drawings
- C: NPDES permit / state CGP authorization
- D: Notice of Termination (when filed)
- E: Inspection report forms (blank + completed)
- F: Subcontractor certifications
- G: Endangered species / historic preservation documentation
Guidelines
- State tailoring — CGP varies by state; confirm BMP design standards, inspection frequencies, stabilization deadlines, and reporting thresholds
[VERIFY] - 303(d) / TMDL waters — trigger enhanced BMPs and potentially numeric effluent limits; flag prominently in site description
- MS4 permits — check for local requirements beyond the CGP
- Multi-operator sites — each operator needs own SWPPP or clearly defined responsibilities in shared plan
- Do not certify — include signature blocks but operator (not drafter) must sign
- Linear projects (roads, utilities) — use phased approach with separate BMP plans per active segment
- Federal citations: 40 CFR § 122.26, 40 CFR § 450.21, CWA § 402
[VERIFY CGP version year against current EPA issuance] - Mark all state-specific citations with
[VERIFY]unless user provides applicable state CGP