epc-contract

Drafts turnkey Engineering, Procurement, and Construction (EPC) contracts for industrial facility projects. Covers scope of work, commercial terms, performance guarantees, risk allocation, warranties,

SKILL.md

GitHub

EPC Contract

Drafts a turnkey EPC contract establishing rights, obligations, risk allocations, and technical requirements between a project owner and contractor for design, procurement, construction, testing, and commissioning of an industrial facility.

Prerequisites

Gather before drafting:

  1. Project description — facility type, capacity, throughput specs, location
  2. Party details — legal names, entity types, jurisdictions, addresses, authorized signatories
  3. Governing documents — RFPs, term sheets, LOIs, precedent agreements
  4. Pricing structure — lump-sum, GMP, cost-plus, or hybrid
  5. Schedule — target milestones, NTP conditions, substantial/final completion dates
  6. Performance requirements — output capacity, efficiency, emissions, availability guarantees
  7. Jurisdiction — governing law, regulatory/permitting regime
  8. Insurance requirements — owner's minimum coverage expectations

Contract Sections

Draft all 14 sections in order.

1. Recitals & Parties

  • Owner: legal name, entity type, jurisdiction, address, tax ID, authorized rep
  • Contractor: same; if JV/consortium — lead contractor, liability structure (joint & several or allocated)
  • Recitals: owner's objectives, contractor qualifications, turnkey intent

2. Definitions

Define at minimum:

Term Criteria
Substantial Completion Work complete except punch list; testing passed; performance met; regulatory approvals obtained; O&M docs delivered
Final Completion Punch list closed; all performance tests passed at guaranteed levels; reliability demo done; training complete; final documentation
Contract Price Fixed amount, inclusions, adjustment mechanisms
Change Order Written modification to scope, schedule, or price
Force Majeure Natural disasters, war, epidemics, government action, non-party labor disputes
Defect Non-conformance with specs, drawings, guarantees, or codes
Warranty Period Commencement trigger and duration

Include project-specific technical terms referencing industry standards (ASME, IEEE, ISA).

3. Scope of Work

A. Engineering — All disciplines (civil/structural, mechanical, electrical, I&C, process, environmental, safety); conceptual through detailed.

B. Procurement — Major equipment (turbines, generators, compressors, vessels, heat exchangers), bulk materials, spare parts, special tools. Identify owner-furnished items with interface requirements.

C. Construction & Installation — Site prep, civil, foundations, structural, mechanical/piping, electrical/instrumentation, insulation/painting/fireproofing. Reference applicable codes.

D. Testing & Commissioning — Factory acceptance → pre-commissioning → integrated systems → performance testing → reliability demo. Include owner witness rights and acceptance criteria.

E. Ancillary — Permitting (allocate owner vs. contractor), training (classroom + hands-on), documentation deliverables (design basis, as-builts, O&M manuals — specify format/schedule).

F. Exclusions — Land acquisition, off-site utilities to boundary, owner personnel, financing, owner-controlled insurance, owner permits.

4. Commercial Terms

Contract Price: Exact amount and currency. Pricing type (lump-sum/GMP/cost-plus/hybrid). Confirm all E, P, C, testing, commissioning, training, documentation included. Adjustments limited to owner changes, differing site conditions, force majeure, change in law.

Payment Schedule:

Milestone Typical % Conditions
Advance payment 5–10% Advance payment guarantee required
Engineering milestones Per deliverable Basic/detailed design completion
Equipment delivery Per item value Delivery receipts
Construction progress Monthly Joint measurement/verification
Substantial Completion Major tranche Less retention
Final Completion Balance + retention All guarantees satisfied
  • Retention: 5–10%; partial release at Substantial Completion, balance at Final Completion; contractor may substitute bond/LC
  • Invoicing: Submit within [X] days; owner review 15–30 days; payment within 30 days of approval; interest on late undisputed amounts
  • Taxes: Allocate sales tax, VAT, customs duties, import taxes

5. Schedule

  • Commencement: NTP conditions precedent (site access, permits, financing)
  • Duration: Calendar days/months from NTP to Final Completion
  • Key milestones: Design → PO awards → long-lead delivery → construction start → mechanical completion → commissioning → Substantial Completion → performance testing → Final Completion
  • Certification: Contractor notice → owner inspection → completion certificate

Delay Management:

Delay Type Time Extension Cost Recovery
Force majeure Yes No
Change in law Yes No
Government permit delays Yes No
Owner-caused delays Yes Yes
Owner scope changes Yes Yes
Differing site conditions Yes Yes
  • Notice: prompt written notice + cause + critical path impact + time request
  • Delay LDs: Daily/weekly rate for late Substantial Completion; cap 5–15% of contract price
  • Early completion bonus (optional): per day/week ahead of schedule

6. Performance Guarantees

Guaranteed Parameters (select applicable):

Parameter Value Reference Conditions Test Standard
Output capacity [kW/units] ISO or site ambient ASME PTC
Efficiency/heat rate [%/BTU/kWh] Fuel spec, ambient ASME PTC
Emissions [g/unit] per pollutant Operating conditions EPA/regulatory
Availability [%] Defined period Contract formula
  • Include correction curves for reference conditions
  • Test protocol: timing, duration, valid runs, stability criteria, instrumentation, data recording
  • Retest rights: optimization period; max retests specified

Performance LDs:

Shortfall LD Formula Cap
Capacity $/unit below guarantee [X]% of contract price
Efficiency PV of increased operating costs [X]% of contract price
Emissions Cost of additional controls [X]% of contract price
  • Rejection threshold: shortfall exceeding [X]% → owner may reject facility

7. Change Management

  • Formal written change order required before work begins (emergency exception with retroactive approval)
  • Contractor proposal within 10–20 business days: scope, cost breakdown, markup (10–20% OH&P), schedule/CPM impact, effect on guarantees
  • Pricing: lump-sum, unit price, T&M, or cost-plus
  • Owner review: 15–30 days
  • Disputed changes: contractor proceeds under directed change order; pricing resolved via dispute resolution
  • Cumulative changes exceeding [X]% trigger renegotiation or termination-for-convenience rights

8. Indemnification & Liability

Contractor indemnifies Owner for: bodily injury/death, property damage, regulatory violations, IP infringement, environmental contamination, breach.

Owner indemnifies Contractor for: owner negligence/willful misconduct/breach; defects in owner-furnished items.

Exceptions: Claims from sole negligence of indemnified party. Joint negligence: comparative fault.

Procedure: Prompt notice → indemnifying party controls defense → cooperation → settlement limits.

Liability caps:

  • Consequential damages mutually excluded (exceptions: gross negligence, willful misconduct, confidentiality, IP, environmental)
  • Aggregate cap: contract price (or [X]x); uncapped: indemnity, IP, willful misconduct, fraud

9. Insurance

Coverage Minimum Limit Requirements
CGL $10–50M per occurrence/aggregate Additional insured; primary & non-contributory
Workers' Comp Statutory per jurisdiction Employers' liability $1M
Auto Liability $1M CSL All owned/hired/non-owned
Professional Liability (E&O) $5–25M per claim/aggregate Claims-made with 3–5 year tail
Builder's Risk Full replacement value Specify owner vs. contractor placement
Marine Cargo Full shipment value If international; origin to site
Pollution Liability Project-appropriate If environmental risk
Umbrella/Excess Project-appropriate Above primary policies

All policies: owner as additional insured, waiver of subrogation, 30-day cancellation notice, certificates before work starts.

10. Warranties

  • Scope: All work free from defects in materials, workmanship, and design
  • Period: 12–24 months from Substantial Completion; restarts for repaired/replaced items
  • Materials: New unless specified; suitable for intended purpose
  • Pass-through: Assign all manufacturer/supplier warranties to owner
  • Defect correction: Written notice → repair within 24 hours (urgent) to 10 business days (non-urgent) → costs on contractor
  • Self-help: If contractor fails to correct, owner may correct and charge contractor
  • Security: Bond or LC, 5–10% of contract price; released on warranty expiration

11. Termination

Trigger By Notice/Cure Contractor Gets
Cause (abandonment, schedule failure, insolvency) Owner Written + 10–30 day cure Work performed only; liable for excess costs
Convenience Owner Written notice Work + materials + demobilization + OH (no profit on unperformed)
Owner default (non-payment, suspension, breach) Contractor Written + cure period Work + costs + anticipated profit on full contract
Extended force majeure (>6 months) Either Written notice Work + costs (no anticipated profit)

12. Dispute Resolution

Tiered process:

  1. Negotiation — Senior executives, 30 days
  2. Mediation — Mutually acceptable mediator, 60 days
  3. Binding — Arbitration (ICC/AAA; 1 or 3 arbitrators; specify seat/language) OR litigation (exclusive jurisdiction/venue)
  • Governing law: [Jurisdiction], excluding conflicts-of-law. Exclude CISG if international.
  • Fees: Each party bears own OR prevailing party recovers
  • Jury waiver: Include if parties prefer bench trial

13. Administrative Provisions

  • Notices: Written; delivery/courier/certified mail/email; effective on receipt
  • Assignment: Contractor needs owner consent; owner assigns freely to affiliates/lenders
  • Boilerplate: Entire agreement, amendments in writing, severability, non-waiver, mutual confidentiality, force majeure (notice + mitigation)

14. Execution

Signature blocks: entity name, signature, printed name, title, date. Add notarization/witness if required by governing law.

Pitfalls

  • Confirm pricing structure before drafting commercial terms
  • Mark uncertain statutory/regulatory citations with [VERIFY] for the specific jurisdiction
  • Scale insurance minimums to project size and risk profile
  • LD rates must reflect reasonable pre-estimates of actual damages to be enforceable
  • Performance guarantees and test protocols are project-specific — confirm with user before finalizing
  • For JV/consortium contractors, explicitly address lead designation and liability allocation
  • Flag gaps in provided information — never assume critical business terms
  • Verify internal consistency of cross-references, defined terms, and exhibit/schedule references
  • For international projects: address currency, CISG exclusion, arbitration seat, language, import/export compliance