deprecation-and-migration
Plan or implement retirement of a system, API, feature, persisted configuration, or database shape. Use for compatibility cutovers, explicit deprecation review, or an explicit unreleased replacement d
SKILL.mdsrc/deprecation-and-migration/SKILL.md
GitHubDeprecation and Migration
Choose the smallest safe removal path from actual consumers and retained data. Keep analysis, repository edits, deployment, external communication, and data destruction within the existing task authorization; a migration plan grants none of those effects by itself.
- Inventory consumers, owners, versions still running, persisted data and config, and observable behavior they depend on. Establish the reason for retirement, replacement or intentional loss of functionality, and compatibility boundary. For unreleased code with no external consumers or retained data, use direct replacement and existing checks rather than a staged migration framework.
- Order the cutover around actual coexistence requirements. When old and new versions must run together, keep both valid at each phase. For schema changes that need it, expand additively, backfill in bounded batches, switch reads and writes with verification, then contract after old consumers are gone. Use adapters, dual writes, or flags only where that coexistence requires them.
- Specify each phase's prerequisite, change, verification, owner, and recovery action. Check output correctness and retained data, not just zero code hits. Reuse existing fixtures and migration tooling. State how retries remain safe and how partial backfills or interrupted cutovers resume.
- Distinguish reverting code from recovering data. Test recovery where possible; for irreversible changes, state what is lost, the backup/restore or forward recovery path and its limits, and any required authorization before proceeding. Never claim a down migration can recover destroyed data without evidence.
- Define deletion conditions: supported consumers have switched, required data is preserved or its loss authorized, compatibility/recovery checks pass, and the observation window required by the task is complete. Remove obsolete code, tests, config, and docs only when those conditions hold. Keep customized user configuration unless its migration is explicitly authorized.
Finish with consumer/data inventory, cutover order, verification and recovery per phase, deletion conditions, and unresolved blockers. Completion means the requested planning or implementation phase is evidenced; a written plan is not proof that a production migration or retirement happened.