e1011-task

Use when define task characteristics to feed human-centred design (HCD) analysis per ECSS-E-ST-10-11C §4.2.1.4: identify each operator task by name and mission phase, assign a frequency category (rare

SKILL.md

GitHub

ECSS Human Factors Engineering — Task Characterization for HCD (space-systems/ecss/e1011-task)

Use when the task is to define operator tasks and their key characteristics (frequency, criticality, workload) per ECSS-E-ST-10-11C §4.2.1.4 so that the human-centred design process has a quantified task inventory to drive display design, automation boundaries, training scope, and workload mitigation decisions.

Domain quick reference

  • §4.2.1.4 requires the engineering team to produce a task inventory for every operator interaction with the system. Each entry covers three mandatory characteristics: frequency, criticality, and workload.
  • Frequency captures how often the task is performed in a reference mission: rare (once or a few times per mission), occasional (weekly or less), or routine (daily or more). Frequency drives training repetition requirements and procedure refresh intervals.
  • Criticality captures the consequence if the task is performed incorrectly or not at all: safety-critical (risk of crew injury, loss of life, or loss of vehicle), mission-critical (risk of mission abort or loss of primary mission objective), or non-critical (minor impact, recoverable). Criticality drives the depth of error-tolerance design and the level of independent verification required in the procedure.
  • Workload is assessed across four dimensions — physical demand, cognitive demand, time pressure, and consequence of error — each rated low, medium, or high. The four ratings are summed (1/2/3 per level) into a score of 4–12. Scores 10–12 map to a high workload band, 7–9 to medium, 4–6 to low.
  • A task is flagged high-risk when its criticality is safety-critical or mission-critical AND its workload band is high. High-risk tasks require prioritized HCD attention: automation assistance, display cueing, workload reduction, or procedure simplification.

Workflow

  1. Enumerate every operator interaction with the system for each mission phase. Name each task concisely (verb + object, e.g. "Verify docking latch engagement") and record its mission phase. Reject any entry with an empty name or phase.
  2. Assign a frequency category (rare / occasional / routine) to each task based on the mission timeline. Use the reference mission duration as the denominator; if a task spans multiple phases, assign the category for the highest-frequency occurrence.
  3. Assign a criticality level (safety-critical / mission-critical / non-critical) based on the worst credible consequence of the task being omitted or executed incorrectly. Use the system's hazard log as the authority for safety-critical assignments.
  4. Rate each of the four workload dimensions (physical demand, cognitive demand, time pressure, consequence of error) as low, medium, or high, then compute the total workload score. Derive the workload band from the score: 10–12 = high, 7–9 = medium, 4–6 = low.
  5. Flag every task whose criticality is safety-critical or mission-critical AND whose workload band is high. Record these as high-risk tasks requiring dedicated HCD mitigation.
  6. Compile the full task inventory table (name, phase, frequency, criticality, workload score, workload band, high-risk flag) and deliver it as an input to the HCD planning activity. Confirm that every task entry has passed validation before inclusion.

Pitfalls

  • Omitting the workload assessment for non-critical tasks: even non-critical tasks with high workload can interfere with adjacent critical tasks through operator saturation, so the workload score must be recorded for all tasks.
  • Conflating criticality with complexity: a highly complex task (high cognitive demand) is not automatically safety-critical; criticality is determined by consequence, not by difficulty.
  • Treating the workload band as an absolute ceiling: the four-dimension score is a planning heuristic, not a certified human-factors rating; any task approaching the high band boundary (score 9–10) should be reviewed by the human-factors lead before its band is finalized.
  • Leaving a task's criticality as safety-critical without a corresponding hazard-log reference: the assignment must be traceable to a specific hazard entry, not an informal judgment.
  • Applying the same workload score across all mission phases for a task that changes character (e.g. an EVA procedure performed under nominal versus contingency conditions); use separate task entries for significantly different operational contexts.

Behavior contract (gate 3)

The task-validation, workload-scoring, band-mapping, high-risk-flagging, and inventory-analysis logic is exercised by the gate 3 contract test: scripts/test_e1011_task.py against scripts/e1011_task_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e1011_task.py