e10-sep
Use when you must produce or maintain the System Engineering Plan (SEP) for a European space project per ECSS-E-ST-10C: decide when a lifecycle event forces the SEP to be revised, check that lower-lev
SKILL.mdskills/space-systems/ecss/e10-sep/SKILL.md
GitHubECSS System Engineering Plan (space-systems/ecss/e10-sep)
Use when the task is ECSS-E-ST-10C clause 5.1 system engineering planning: keeping the SEP current, checking lower-level plans against its baseline, and preparing the SEP-derived package that backs the PM at project reviews.
Domain quick reference
- ECSS-E-ST-10C §5.1 requires the SEP to be produced early in the project and then maintained: it is revised and rebaselined whenever the lifecycle event demands it, not written once and left static.
- Typical maintenance triggers: a phase transition, a requirements baseline change, an approaching review gate, or a change to the project organisation. Routine status reporting alone does not force a revision.
- Lower-level plans (product assurance, AIV, risk management, configuration management, software management) each derive from the SEP; every one of them must carry a baseline tag consistent with the SEP's current baseline, or it is flagged for update.
- The SE function supports the PM at every project review gate (MDR, PRR, SRR, PDR, CDR, QR, AR, FRR, CRR, ER) with a package drawn from the SEP: task status, WBS/schedule status, risk status, and organisation/interface status, plus items specific to the gate (for example design-baseline consistency at PDR/CDR, verification closure at QR/AR/FRR).
Workflow
- Evaluate each pending lifecycle event with sep_maintenance_trigger and revise/rebaseline the SEP before any event that returns True.
- Collect the current baseline tag for the SEP and for each lower-level plan (product assurance, AIV, risk management, configuration management, software management).
- Check each lower-level plan for consistency with the SEP baseline using lower_plan_consistency; update any plan flagged inconsistent-update-required.
- Assemble the review support package for the upcoming gate with review_support_package.
- Combine steps 3 and 4 with sep_status_verdict to confirm the SEP is consistent and the PM's support package is ready before the review.
Pitfalls
- Treating the SEP as a one-time deliverable instead of a maintained plan revised at phase transitions and baseline changes.
- Letting a lower-level plan (especially the AIV or risk management plan) drift onto an older baseline than the SEP.
- Handing the PM a generic status pack instead of the gate-specific items (for example skipping verification closure status ahead of QR/AR/FRR).
- Confusing plan production (writing the SEP once) with plan maintenance (keeping it and its dependents baseline-consistent).
Behavior contract (gate 3)
The maintenance-trigger, plan-consistency, and review-support-package logic is exercised by the gate 3 contract test: scripts/test_e10_sep.py against scripts/e10_sep_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e10_sep.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.