Log work time on a Plane work item (create a work log entry) Arguments: <project> <item> <duration> [description].

SKILL.md

GitHub

Log Time

Create a work log entry against a Plane work item. Time is stored as integer minutes in the API — convert human input.

Arguments

Format: <project> <item> <duration> [description]

  • project: project name or identifier
  • item: work item identifier (e.g. PROJ-42) or UUID
  • duration: human form (2h, 2h30m, 45m, 1.5h, PT2H30M) — convert to integer minutes
  • description (optional): free text — what was done

Parse from "$ARGUMENTS".

Process

  1. Bootstrap connector — consult connector-bootstrap. Probe for the Plane resource tools work_log, project and workitem.
  2. Verify time tracking is enabled — project(action=retrieve, project_id); if is_time_tracking_enabled is false, tell the user how to enable it (project settings → features, or project(action=update, project_id, is_time_tracking_enabled=true) with their consent) and stop. A plan without time tracking refuses work_log calls with a message naming the feature.
  3. Resolve project → project_id. Resolve work item → if identifier like PROJ-42, use workitem(action=retrieve_by_identifier, workitem_identifier="PROJ-42"); if UUID, skip.
  4. Convert duration to minutes:
    • 2h → 120, 2h30m → 150, 45m → 45, 1.5h → 90, PT2H30M → 150
    • Reject if result < 1 or > 24h in a single entry (likely a typo); ask user to confirm.
  5. Create the log — work_log(action=create, project_id, workitem_id, duration=<minutes>, description).
  6. Confirm — print: total logged today on this item, total logged on this item (work_log(action=list, project_id, workitem_id), follow next_cursor; work_log lists one work item at a time), and the project totals from project(action=worklog_summary, project_id).

Subcommands

The base form logs time. Additional verbs (parse <verb> ... if first arg is one of these):

  • summary <project> → project(action=worklog_summary, project_id) — total logged per user / per item
  • list <project> <item> → work_log(action=list, project_id, workitem_id) for that item
  • delete <project> <item> <log_id> → work_log(action=delete, project_id, workitem_id, work_log_id) (confirm first)
  • update <project> <item> <log_id> <duration> → work_log(action=update, project_id, workitem_id, work_log_id, duration=<minutes>)

Examples

/log-time "TaskFlow" PROJ-148 2h "Debug Safari login bug + fix"
/log-time "TaskFlow" PROJ-148 45m
/log-time summary "TaskFlow"
/log-time list "TaskFlow" PROJ-148
/log-time delete "TaskFlow" PROJ-148 9f2c-...

Best Practices

  • Log time at the end of each work session, not in batch at week's end — accuracy drops sharply after 24h.
  • One entry per session per item. Don't merge a whole day into one log.
  • Use /log-time summary before estimation sessions — actual minutes per story point is the most honest velocity input (see velocity-metrics skill).